Line 2 | |
---|---|
![]() platform of
Tongfu Beilu | |
Overview | |
Status | Operational |
Locale | Nantong, Jiangsu, China |
Termini | |
Service | |
Type | Rapid transit |
System | Nantong Rail Transit |
History | |
Opened | 27 December 2023 |
Technical | |
Line length | 20.85 kilometres (12.96 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Highest elevation | Underground |
Line 2 of the Nantong Rail Transit ( Chinese: 南通轨道交2号线; pinyin: Nántōng Guǐdào Jiāotōng èr hào xiàn) is a rapid transit line in Nantong, Jiangsu, China. It runs from Xingfu station to Xianfeng station. [1] The line is 20.85 kilometres (13.0 mi) in length with 17 underground stations, of which one station Nantong Railway Station is suspended for operation due to lack of enough entrances. [2]
Construction began on October 26, 2018. [3] Test operation started on June 19, 2023 [4] and trial-ride activity started 8–10 December 2023. [5] The line started operation on December 27, 2023. [6] [7]
Station name | Connections | Location | |
---|---|---|---|
English [1] | Chinese | ||
Xingfu | 幸福 | Tongzhou | |
Nantong Railway Station | 南通站 |
![]() |
Chongchuan |
Chang'an | 长岸 | ||
Bei Dajie | 北大街 | ||
Beicheng Bridge | 北城大桥 | ||
Zhongxiu Xilu | 钟秀西路 | ||
Hepingqiao | 和平桥 | 1 | |
Sports Park | 体育公园 | ||
Yijiaqiao | 易家桥 | ||
Wenfeng | 文峰 | 1 | |
Wuyi Lu | 五一路 | ||
Yuanlin Lu | 园林路 | ||
East Coach Station | 汽车东站 | ||
Tongfu Beilu | 通富北路 | ||
Guanyinshan | 观音山 | ||
Nantongdong Railway Station | 南通东站 |
![]() | |
Xianfeng | 先锋 | ||
Line 2 | |
---|---|
![]() platform of
Tongfu Beilu | |
Overview | |
Status | Operational |
Locale | Nantong, Jiangsu, China |
Termini | |
Service | |
Type | Rapid transit |
System | Nantong Rail Transit |
History | |
Opened | 27 December 2023 |
Technical | |
Line length | 20.85 kilometres (12.96 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Highest elevation | Underground |
Line 2 of the Nantong Rail Transit ( Chinese: 南通轨道交2号线; pinyin: Nántōng Guǐdào Jiāotōng èr hào xiàn) is a rapid transit line in Nantong, Jiangsu, China. It runs from Xingfu station to Xianfeng station. [1] The line is 20.85 kilometres (13.0 mi) in length with 17 underground stations, of which one station Nantong Railway Station is suspended for operation due to lack of enough entrances. [2]
Construction began on October 26, 2018. [3] Test operation started on June 19, 2023 [4] and trial-ride activity started 8–10 December 2023. [5] The line started operation on December 27, 2023. [6] [7]
Station name | Connections | Location | |
---|---|---|---|
English [1] | Chinese | ||
Xingfu | 幸福 | Tongzhou | |
Nantong Railway Station | 南通站 |
![]() |
Chongchuan |
Chang'an | 长岸 | ||
Bei Dajie | 北大街 | ||
Beicheng Bridge | 北城大桥 | ||
Zhongxiu Xilu | 钟秀西路 | ||
Hepingqiao | 和平桥 | 1 | |
Sports Park | 体育公园 | ||
Yijiaqiao | 易家桥 | ||
Wenfeng | 文峰 | 1 | |
Wuyi Lu | 五一路 | ||
Yuanlin Lu | 园林路 | ||
East Coach Station | 汽车东站 | ||
Tongfu Beilu | 通富北路 | ||
Guanyinshan | 观音山 | ||
Nantongdong Railway Station | 南通东站 |
![]() | |
Xianfeng | 先锋 | ||