Lindhurst Wind Farm | |
---|---|
| |
Country | England, UK |
Location | Lindhurst, East Midlands, Nottinghamshire |
Coordinates | 53°06′58″N 01°08′48″W / 53.11611°N 1.14667°W |
Status | Operational |
Commission date | 10 September 2010 |
Owner(s) | Npower Renewables |
Wind farm | |
Type | Onshore |
Hub height | 60 m (197 ft) |
Rotor diameter | 90 m |
Site elevation | 120 m |
Power generation | |
Units operational | 5 |
Make and model | Vestas Wind Systems: Vestas V90 |
Nameplate capacity | 9 MW |
Lindhurst Wind Farm is a power-producing wind farm in Lindhurst parish near Mansfield, England. Built for Npower Renewables, it produces electricity from five wind turbines. It has a total nameplate capacity of 9 MW of electricity, providing enough power to serve the average needs of 5,400 homes. [1]
The turbines stand 125 metres (410 ft) high to the rotor tip, making them the tallest in Nottinghamshire. [2]
Lindhurst Wind Farm was approved by the local planning committee at Newark and Sherwood District Council in September 2007. [3] [4] Local councillors voted 8–3 in favour of the application, which had been recommended for approval by the council's planning officer and supported by 3,300 local residents petition of support. [5]
Preparatory work for the site began in 2008, with the wind turbines being erected in August 2010. The turbines went live on 10 September 2010. [1]
Lindhurst Wind Farm | |
---|---|
| |
Country | England, UK |
Location | Lindhurst, East Midlands, Nottinghamshire |
Coordinates | 53°06′58″N 01°08′48″W / 53.11611°N 1.14667°W |
Status | Operational |
Commission date | 10 September 2010 |
Owner(s) | Npower Renewables |
Wind farm | |
Type | Onshore |
Hub height | 60 m (197 ft) |
Rotor diameter | 90 m |
Site elevation | 120 m |
Power generation | |
Units operational | 5 |
Make and model | Vestas Wind Systems: Vestas V90 |
Nameplate capacity | 9 MW |
Lindhurst Wind Farm is a power-producing wind farm in Lindhurst parish near Mansfield, England. Built for Npower Renewables, it produces electricity from five wind turbines. It has a total nameplate capacity of 9 MW of electricity, providing enough power to serve the average needs of 5,400 homes. [1]
The turbines stand 125 metres (410 ft) high to the rotor tip, making them the tallest in Nottinghamshire. [2]
Lindhurst Wind Farm was approved by the local planning committee at Newark and Sherwood District Council in September 2007. [3] [4] Local councillors voted 8–3 in favour of the application, which had been recommended for approval by the council's planning officer and supported by 3,300 local residents petition of support. [5]
Preparatory work for the site began in 2008, with the wind turbines being erected in August 2010. The turbines went live on 10 September 2010. [1]