PhotosLocation


la+rábida+high+school Latitude and Longitude:

37°15′50″N 6°56′55″W / 37.2639°N 6.9485°W / 37.2639; -6.9485
From Wikipedia, the free encyclopedia
Institute of Secondary Education La Rábida
Instituto de Educación Secundaria La Rábida
EstablishedJune 13, 1856 (1856-06-13)
DirectorJuan Antonio Moreno Caro
Academic staff
60
Students1000
Location,
37°15′50″N 6°56′55″W / 37.2639°N 6.9485°W / 37.2639; -6.9485
Website http://www.iesrabida.es/
La Rabida High School. Corner of the south-east facade.

La Rábida High School is a public educational center located in the city of Huelva, Andalusia, Spain. It is the institute with more history in all the Province, [1] taking more than 160 years. In addition, the institute is considered a benchmark in education throughout the province. [2] The teaching center has a staff of 60 teachers and more than 1000 students enrolled.

History

The Institute of Secondary Education "La Rábida" was founded by the Royal Order of June 13, 1856 as a secondary school during the reign of Isabel II and it was officially inaugurated in October of the same year by the Civil Governor of Huelva, Adolfo de Castro, and the first director of the institute Vicente Rodríguez García. [1] In its history it has passed through many venues. The first one was the Convent of San Francisco, which is now the Church of the Jesuits; the Convent of La Merced, now a University, which in Huelva is known as the Old Institute; and the current one in the Manuel Siurot Avenue since the 1933-34 course. The architect of the current headquarters of the center (Manuel Siurot) was Pérez Carasa. [3]

Its style is difficult to frame because it presents features of all the styles that were fashionable at the time ( historicism, modernisme, neo-gothicism, ...) that make its architecture personal. What is identifying is that it was designed and built in an era in which the functionality of architecture begins to be one of its signs of identity. It is shown as the best example of the work of this unique architect, who knew how to adapt this work to the natural environment of the capital of Huelva, because the building is located on one of the big mountains in Huelva. [2]

Two students stand out from this school:

  • Antonia Arrobas y Pérez was the first woman officially registered to do the secondary education in Spain (1871). Born in Talavera la Real, the daughter of a carpenter and a housewife, she applied for an examination at the Huelva institute to validate the studies she had completed privately, but at that time in the educational field the current norm used the student term to refer to all enrollment process, understanding the legislators that the education was just for women. That is why the demand for Arrobas had to be referred to the rector of the University of Seville and the general director of Public Instruction, who finally granted permission. [4] [5]
  • Juan Ramón Jiménez, Spanish poet winner of the Nobel Prize for Literature in 1956, also studied at this educational center. [6]

The institute served as a royal room in the visit that King Alfonso XII made to the city of Huelva in the year 1882. [3]

In 1903, the first meteorological station of Huelva and its province [3] was established at the institute. It was directed by teachers of the center and they owe the first official climate data available in our province and city. In this center was also founded the first schools for workers or professionals of Huelva in the 19th century.

La Rábida Institute is distinguished as a Historical Educational Institute of Andalusia. The centers like this recognized as such as part of a Network of Historical Educational Institutes of Andalusia and can share resources, experiences and initiatives, as well as disseminate their history through educational projects. [1]

In addition, La Rábida Institute is a member of the Order of Alfonso X El Sabio (educational award) for its educational work, becoming the only one in the province and one of the thirteen centers in Andalusia. This distinction was awarded by the Ministry of Education and the Royal House last February 2022. [7]

La Rábida High School, eastern facade.

Teaching

In the educational center the following teachings are offered:

Chronology and controversies of the reform

2000-2017

Since 2000 approximately, there is a project for the modernization work of the center. This action of the Regional Government of Andalusia would provide the center with a new gymnasium and would provide its facilities respecting its patrimonial protection.

This comprehensive reform of the institute has been waiting for both teachers and students of the center since 2000, arising year after year rumors that "the works will be undertaken the next course." Due to the great reform it would mean, during this time, it would not be possible to teach the classes in the center, so therefore, an alternative place should be sought until the works are finished, but it is still unknown where it would be. [8]

Before the beginning of the works in 2020 (definitive date), there were many meetings with politicians and high officials of Education for several consecutive years. One of them was in 2014: On December 2, 2014, the territorial delegate for Education, Vicente Zarza, explained that this reform would have a budget of almost 8 million euros, with the aim of drafting the project "that equips the center with of facilities appropriate to their typology”. Despite the announcement, no definitive project was awarded, much less the beginning of the works. [9]

2017-2020

On February 28, 2017, Vicente Zarza announced that the Andalusian Government had allocated almost 400,000 euros to project drafting and geotechnical study services for the modernization work of La Rábida High School. The delegate expressed the importance of this highly relevant action for the city, "preceded by a complex administrative process and which is gradually materializing". Once again, everything was left up in the air and there was nothing definitive. [10]

On October 17, 2017, a plan for the evacuation of the Bachillerato and the ESO was carried out due to the heavy rains suffered throughout the morning, which flooded all the corridors and classrooms of the High School, claiming once again the necessary action of the reform that the center needs. [11]

La Rábida High School. Gate of the main facade.

On November 9, 2017, the educational center was the subject of debate in the Andalusian Parliament due to its reform. The popular parliamentarian Guillermo García asked the Education Commission of the Andalusian Parliament the start date of the works to the responsible of Education in Andalusia, Sonia Gaya, who responded by arguing that the Andalusian Government had not have deadlines set yet to begin the reform, and insisted that the execution periods depend on the development of the administrative and contracting procedures that are associated with an action of this magnitude. [12]

On November 11, 2017, 'Huelva Información's newspaper published an article explaining the discontent that existed both in the educational center and in the rest of Huelva society with the words of the responsible of Education from 2 days ago. After 15 years of waiting, Education did not know when the works would begin. [13]

On January 23, 2018, the delegate of the Government of the Andalusian Government in Huelva, Francisco José Romero, and the territorial delegate of Education, Vicente Zarza, offered the main data and the lines of action in the improvement of the school infrastructures of the province, within the framework of the Infrastructure and Equipment Plan for non-university education of Education. In this plan, the largest amount was taken by La Rábida High School with a total of 7,454,700 euros. However, no deadline was given on this date either. [14]

On February 12, 2018, the representative of all the students of La Rábida High School and delegate of the educational center, Gonzalo López Castilla, attended the meeting of the Provincial School Council, held in the Delegation of Education of Huelva. In this meeting, the delegate alleged that the institute had many shortcomings, such as constant power cuts and water, malfunctioning heating, flooding, etc., not meeting the necessary conditions of a teaching center. He asked to Tania González, the president of the table (Head of planning and education in Huelva), if the dates of the beginning of the works would be finally known. Finally, she did not know how to answer, having no idea about when the remodeling of the institute will begin. [15]

On March 25, 2019, the Andalusian Public Education Agency of the Ministry of Education of Junta de Andalucía, gives the green light to the study in detail covering the area of the land plots on La Rábida High School and Diego de Guzmán y Quesada High School. The objective would be to modify the layout of the open spaces in this area by building a new gym on the plot of the La Rábida Institute, relocating the car park space for the teachers of the center; as well as the construction of a transformation center in the plot corresponding to the Diego de Guzmán y Quesada Institute. [16]

2020 - present

On June 5, 2020, is a definitive date: the Andalusian Minister of Education, Javier Imbroda, presented the award of the Andalusian Government on the works of the institute for 6.2 million euros. Imbroda assured that the action will have an execution period of 26 months and will consist of the comprehensive reform, expansion and modernization of the Huelva institute, respecting patrimonial protection at all times. Thus, on a visit to the educational center, Imbroda has indicated that the award is part of an amount of 6,265,001.06 euros. The Andalusian Ministerio stressed that these works will provide the center with adequate facilities for the teachings it provides and will allow "restoring the damage that has accumulated in the building over the years." Adding the project writing fees and the planned equipment endowment, the performance exceeds 6.9 million euros of investment.

On August 15, 2020, prefabricated classrooms were placed in the facilities outside the center to be able to teach classes in them during the works. Most classes are currently being taught (course 2021/2022) in these prefabricated classrooms. However, due to the number of students, there are other courses (only 'Bachillerato') that are being taught at 'CEIP Tres Carabelas', as La Rábida High School made known through a statement on its social networks. [17] [18] [19]

On August 24, 2020, the comprehensive reform began and from this day, the center is immersed in a profound remodeling, with the performance having an execution period of 26 months. The website of the DIAZ CUBERO construction company frequently publishes the update of the works with audiovisual content. [20]

On January 14, 2022, the Andalusian Minister of Education, Javier Imbroda, visited the works of the center to see the pace they were taking and announced that the comprehensive reform of the institute was 55% complete, ensuring that the reopening of the educational center will be the following September 21, 2022, coinciding with the start of the next school year 2022/2023. [21]

Explanation of the reform

The rehabilitation of La Rábida High School (that is being undertaken by the public company DIAZ CUBERO) is using materials that are related to the author's original conception, differentiating two areas of action: existing building and new gymnasium.

The execution of the works is proposed in two execution phases, which currently allows the center's teaching activity to continue in prefabricated classrooms during the first phase.

Phase 1

In phase 1 (in which the project is currently) the prefabricated classrooms were installed (in which teaching is now taking place) and the comprehensive reform of the existing building is being carried out.

Once the provisional classrooms were installed and refurbished, work began inside the building. Actions are being carried out such as demolition of existing false ceilings, review of the state of the floors, as well as their propping, non-structural interior demolitions, demolition of existing floors in contact with the ground, new buried sanitation networks, demolitions structural (forging of the gallery, forging of the music room and the semi-basement staircase), assembly of the tubular scaffolding on the facades and roofs of the building, structural reinforcements, disassembly of the tiled roofs, assembly of pinnacles manufactured in the workshop, restoration of the facades, works inside the building, cladding and interior partitions, installations, cladding and carpentry, exterior urbanization works, reinforced concrete floor, execution of the pavements, cladding and placement of the furniture foreseen in the project.

Phase 2

Phase 2 will start with the beginning of the phase 1 urbanization works, as well as the final works of installations and finishes inside the main building.

During this phase, the dismantling of the prefabricated modules of the classrooms and their provisional facilities will be carried out, the pavements of the sports court will be replaced and demolitions will be carried out in the urbanization of walls and floors. On the other hand, the excavation of land will begin for the execution of the foundation of the new gym.

The area, once the works are finished, will be made up of: gymnasium, transformation center, administration area (archive, offices, counselor's office, teachers' room and toilets), cafeteria, seminars, multifunctional room, library, secondary classrooms, high school classrooms, laboratories, multipurpose classrooms, management classrooms, new covered porch, and 2 sports courts.

Through this action, the different floors of the building will be redistributed to improve its functionality, while maintaining the original design scheme, as reported by the Board. Also, the current assembly hall will be converted for use as a multifunctional room, so that it can host conferences, study/library space and projections. Work will also be done on the institute's archive, whose funds have a high documentary and historical value, to facilitate access for the study and consultation of documents and provide it with fire protection systems.

This action, which has European co-financing through the European Regional Development Fund (Feder), is included in the Plan for Investments in Educational Infrastructures of the Andalusian Ministry of Education and Sport, which is executed through the Andalusian Public Education Agency. [22] [23]

Multimedia gallery of the High School

Bibliography

  • GONZÁLEZ MARQUEZ, Juan Antonio (2007). Diputación Provincial de Huelva, ed. El Instituto La Rábida. 150 años de Educación y Cultura en Huelva. ISBN  978-84-8163-427-3.

References

  1. ^ a b c "La Rábida High School (Huelva), distinguished as a Historical Institute of Education of Andalusia". Huelva Buenas Noticias, Periódico digital de Huelva y provincia centrado en informaciones positivas (in European Spanish). 2018-03-31. Retrieved 2018-04-01.
  2. ^ a b "La Rábida High School, a benchmark in Huelva education and architecture (In Spanish)". Huelva Buenas Noticias, Periódico digital de Huelva y provincia centrado en informaciones positivas (in European Spanish). 2014-10-23. Retrieved 2017-11-11.
  3. ^ a b c GONZÁLEZ MÁRQUEZ, Juan Antonio (2007). IES La Rábida (PDF). Huelva: Ruta del patrimonio educativo andaluz, INSTITUTOS CON HISTORIA (In Spanish). ISBN  978-84-8163-427-3. Retrieved November 11, 2017.
  4. ^ Márquez, Carmen (2016-12-02). "Antonia Arrobas, the student who broke down barriers (in Spanish)". Cadena SER (in European Spanish). Retrieved 2017-11-11.
  5. ^ 20Minutos. "They pay homage to the student who opened the access of the woman to the Baccalaureate in Spain (in Spanish) - 20minutos.es". 20minutos.es - Últimas Noticias. Retrieved 2017-11-11.{{ cite news}}: CS1 maint: numeric names: authors list ( link)
  6. ^ "The Town Hall of Huelva inaugurates on Monday a new monument to Juan Ramón Jiménez on the 125th anniversary of his birth" (in European Spanish). Europa Press. 2007-03-02. Retrieved 2017-11-11.
  7. ^ Información, Huelva (2022-02-28). "La Rábida High School enters the Order of Alfonso X El Sabio for its educational work". Huelva Información (in European Spanish). Retrieved 2022-03-07.
  8. ^ "Tender for the project for the modernization work of La Rábida High School (In Spanish)". Huelva Buenas Noticias, Periódico digital de Huelva y provincia centrado en informaciones positivas. 2016-07-26. Retrieved 2017-04-29.
  9. ^ "Eight million for the reform and integral rehabilitation of La Rábida High School". huelvaya.es (in Spanish). 2014-12-02. Retrieved 2022-03-07.
  10. ^ Información, Huelva (2017-02-28). "The project for the reform of La Rábida High School will be in five months". Huelva Información (in European Spanish). Retrieved 2022-03-07.
  11. ^ "La Rábida High School, evicted after suffering floods". Huelva24 (in Spanish). Retrieved 2017-11-06.
  12. ^ Información, Huelva (2017-11-09). "The Andalusian Government does not guarantee the start date of the works of La Rábida High School". Huelva Información (in European Spanish). Retrieved 2022-03-07.
  13. ^ Información, Huelva (2017-11-11). "Fails at La Rábida High School". Huelva Información (in European Spanish). Retrieved 2022-03-07.
  14. ^ huelva24.com. "The new school of 'El Ensanche' and the reforms of La Rábida High School and Alto Conquero High School, millionaire investments for education". Huelva24 | Toda la información y noticias de Huelva (in Spanish). Retrieved 2022-03-07.{{ cite web}}: CS1 maint: numeric names: authors list ( link)
  15. ^ "Minutes of the Ordinary Session of the Provincial School Council of February 2, 2018" (PDF). Dropbox (in Spanish). Retrieved 2018-12-12.
  16. ^ "Constructions confirmed at La Rábida High School". Huelva's newspaper (in European Spanish). 2019-03-25. Retrieved 2019-04-03.
  17. ^ "Log into Facebook". Facebook. Retrieved 2022-03-07. {{ cite web}}: Cite uses generic title ( help)
  18. ^ "Log into Facebook". Facebook. Retrieved 2022-03-07. {{ cite web}}: Cite uses generic title ( help)
  19. ^ "Log into Facebook". Facebook. Retrieved 2022-03-07. {{ cite web}}: Cite uses generic title ( help)
  20. ^ Información, Huelva (2020-08-15). "Workers install prefabricated classrooms to start the reform of La Rábida High School in Huelva". Huelva Información (in European Spanish). Retrieved 2020-11-19.
  21. ^ Información, Huelva (2022-01-14). "La Rábida High School's works are at 55% and will be reopened on 2022 September 21". Huelva Información (in European Spanish). Retrieved 2022-03-07.
  22. ^ Información, Huelva (2020-06-06). "The Andalusian Government awards the works at La Rábida High School for 6.2 million euros". Huelva Información (in European Spanish). Retrieved 2020-06-06.
  23. ^ "Education awards the reform works of La Rábida High School". Huelva Ya noticias periódico digital de la provincia de Huelva (in Spanish). 2020-06-05. Retrieved 2020-06-06.

la+rábida+high+school Latitude and Longitude:

37°15′50″N 6°56′55″W / 37.2639°N 6.9485°W / 37.2639; -6.9485
From Wikipedia, the free encyclopedia
Institute of Secondary Education La Rábida
Instituto de Educación Secundaria La Rábida
EstablishedJune 13, 1856 (1856-06-13)
DirectorJuan Antonio Moreno Caro
Academic staff
60
Students1000
Location,
37°15′50″N 6°56′55″W / 37.2639°N 6.9485°W / 37.2639; -6.9485
Website http://www.iesrabida.es/
La Rabida High School. Corner of the south-east facade.

La Rábida High School is a public educational center located in the city of Huelva, Andalusia, Spain. It is the institute with more history in all the Province, [1] taking more than 160 years. In addition, the institute is considered a benchmark in education throughout the province. [2] The teaching center has a staff of 60 teachers and more than 1000 students enrolled.

History

The Institute of Secondary Education "La Rábida" was founded by the Royal Order of June 13, 1856 as a secondary school during the reign of Isabel II and it was officially inaugurated in October of the same year by the Civil Governor of Huelva, Adolfo de Castro, and the first director of the institute Vicente Rodríguez García. [1] In its history it has passed through many venues. The first one was the Convent of San Francisco, which is now the Church of the Jesuits; the Convent of La Merced, now a University, which in Huelva is known as the Old Institute; and the current one in the Manuel Siurot Avenue since the 1933-34 course. The architect of the current headquarters of the center (Manuel Siurot) was Pérez Carasa. [3]

Its style is difficult to frame because it presents features of all the styles that were fashionable at the time ( historicism, modernisme, neo-gothicism, ...) that make its architecture personal. What is identifying is that it was designed and built in an era in which the functionality of architecture begins to be one of its signs of identity. It is shown as the best example of the work of this unique architect, who knew how to adapt this work to the natural environment of the capital of Huelva, because the building is located on one of the big mountains in Huelva. [2]

Two students stand out from this school:

  • Antonia Arrobas y Pérez was the first woman officially registered to do the secondary education in Spain (1871). Born in Talavera la Real, the daughter of a carpenter and a housewife, she applied for an examination at the Huelva institute to validate the studies she had completed privately, but at that time in the educational field the current norm used the student term to refer to all enrollment process, understanding the legislators that the education was just for women. That is why the demand for Arrobas had to be referred to the rector of the University of Seville and the general director of Public Instruction, who finally granted permission. [4] [5]
  • Juan Ramón Jiménez, Spanish poet winner of the Nobel Prize for Literature in 1956, also studied at this educational center. [6]

The institute served as a royal room in the visit that King Alfonso XII made to the city of Huelva in the year 1882. [3]

In 1903, the first meteorological station of Huelva and its province [3] was established at the institute. It was directed by teachers of the center and they owe the first official climate data available in our province and city. In this center was also founded the first schools for workers or professionals of Huelva in the 19th century.

La Rábida Institute is distinguished as a Historical Educational Institute of Andalusia. The centers like this recognized as such as part of a Network of Historical Educational Institutes of Andalusia and can share resources, experiences and initiatives, as well as disseminate their history through educational projects. [1]

In addition, La Rábida Institute is a member of the Order of Alfonso X El Sabio (educational award) for its educational work, becoming the only one in the province and one of the thirteen centers in Andalusia. This distinction was awarded by the Ministry of Education and the Royal House last February 2022. [7]

La Rábida High School, eastern facade.

Teaching

In the educational center the following teachings are offered:

Chronology and controversies of the reform

2000-2017

Since 2000 approximately, there is a project for the modernization work of the center. This action of the Regional Government of Andalusia would provide the center with a new gymnasium and would provide its facilities respecting its patrimonial protection.

This comprehensive reform of the institute has been waiting for both teachers and students of the center since 2000, arising year after year rumors that "the works will be undertaken the next course." Due to the great reform it would mean, during this time, it would not be possible to teach the classes in the center, so therefore, an alternative place should be sought until the works are finished, but it is still unknown where it would be. [8]

Before the beginning of the works in 2020 (definitive date), there were many meetings with politicians and high officials of Education for several consecutive years. One of them was in 2014: On December 2, 2014, the territorial delegate for Education, Vicente Zarza, explained that this reform would have a budget of almost 8 million euros, with the aim of drafting the project "that equips the center with of facilities appropriate to their typology”. Despite the announcement, no definitive project was awarded, much less the beginning of the works. [9]

2017-2020

On February 28, 2017, Vicente Zarza announced that the Andalusian Government had allocated almost 400,000 euros to project drafting and geotechnical study services for the modernization work of La Rábida High School. The delegate expressed the importance of this highly relevant action for the city, "preceded by a complex administrative process and which is gradually materializing". Once again, everything was left up in the air and there was nothing definitive. [10]

On October 17, 2017, a plan for the evacuation of the Bachillerato and the ESO was carried out due to the heavy rains suffered throughout the morning, which flooded all the corridors and classrooms of the High School, claiming once again the necessary action of the reform that the center needs. [11]

La Rábida High School. Gate of the main facade.

On November 9, 2017, the educational center was the subject of debate in the Andalusian Parliament due to its reform. The popular parliamentarian Guillermo García asked the Education Commission of the Andalusian Parliament the start date of the works to the responsible of Education in Andalusia, Sonia Gaya, who responded by arguing that the Andalusian Government had not have deadlines set yet to begin the reform, and insisted that the execution periods depend on the development of the administrative and contracting procedures that are associated with an action of this magnitude. [12]

On November 11, 2017, 'Huelva Información's newspaper published an article explaining the discontent that existed both in the educational center and in the rest of Huelva society with the words of the responsible of Education from 2 days ago. After 15 years of waiting, Education did not know when the works would begin. [13]

On January 23, 2018, the delegate of the Government of the Andalusian Government in Huelva, Francisco José Romero, and the territorial delegate of Education, Vicente Zarza, offered the main data and the lines of action in the improvement of the school infrastructures of the province, within the framework of the Infrastructure and Equipment Plan for non-university education of Education. In this plan, the largest amount was taken by La Rábida High School with a total of 7,454,700 euros. However, no deadline was given on this date either. [14]

On February 12, 2018, the representative of all the students of La Rábida High School and delegate of the educational center, Gonzalo López Castilla, attended the meeting of the Provincial School Council, held in the Delegation of Education of Huelva. In this meeting, the delegate alleged that the institute had many shortcomings, such as constant power cuts and water, malfunctioning heating, flooding, etc., not meeting the necessary conditions of a teaching center. He asked to Tania González, the president of the table (Head of planning and education in Huelva), if the dates of the beginning of the works would be finally known. Finally, she did not know how to answer, having no idea about when the remodeling of the institute will begin. [15]

On March 25, 2019, the Andalusian Public Education Agency of the Ministry of Education of Junta de Andalucía, gives the green light to the study in detail covering the area of the land plots on La Rábida High School and Diego de Guzmán y Quesada High School. The objective would be to modify the layout of the open spaces in this area by building a new gym on the plot of the La Rábida Institute, relocating the car park space for the teachers of the center; as well as the construction of a transformation center in the plot corresponding to the Diego de Guzmán y Quesada Institute. [16]

2020 - present

On June 5, 2020, is a definitive date: the Andalusian Minister of Education, Javier Imbroda, presented the award of the Andalusian Government on the works of the institute for 6.2 million euros. Imbroda assured that the action will have an execution period of 26 months and will consist of the comprehensive reform, expansion and modernization of the Huelva institute, respecting patrimonial protection at all times. Thus, on a visit to the educational center, Imbroda has indicated that the award is part of an amount of 6,265,001.06 euros. The Andalusian Ministerio stressed that these works will provide the center with adequate facilities for the teachings it provides and will allow "restoring the damage that has accumulated in the building over the years." Adding the project writing fees and the planned equipment endowment, the performance exceeds 6.9 million euros of investment.

On August 15, 2020, prefabricated classrooms were placed in the facilities outside the center to be able to teach classes in them during the works. Most classes are currently being taught (course 2021/2022) in these prefabricated classrooms. However, due to the number of students, there are other courses (only 'Bachillerato') that are being taught at 'CEIP Tres Carabelas', as La Rábida High School made known through a statement on its social networks. [17] [18] [19]

On August 24, 2020, the comprehensive reform began and from this day, the center is immersed in a profound remodeling, with the performance having an execution period of 26 months. The website of the DIAZ CUBERO construction company frequently publishes the update of the works with audiovisual content. [20]

On January 14, 2022, the Andalusian Minister of Education, Javier Imbroda, visited the works of the center to see the pace they were taking and announced that the comprehensive reform of the institute was 55% complete, ensuring that the reopening of the educational center will be the following September 21, 2022, coinciding with the start of the next school year 2022/2023. [21]

Explanation of the reform

The rehabilitation of La Rábida High School (that is being undertaken by the public company DIAZ CUBERO) is using materials that are related to the author's original conception, differentiating two areas of action: existing building and new gymnasium.

The execution of the works is proposed in two execution phases, which currently allows the center's teaching activity to continue in prefabricated classrooms during the first phase.

Phase 1

In phase 1 (in which the project is currently) the prefabricated classrooms were installed (in which teaching is now taking place) and the comprehensive reform of the existing building is being carried out.

Once the provisional classrooms were installed and refurbished, work began inside the building. Actions are being carried out such as demolition of existing false ceilings, review of the state of the floors, as well as their propping, non-structural interior demolitions, demolition of existing floors in contact with the ground, new buried sanitation networks, demolitions structural (forging of the gallery, forging of the music room and the semi-basement staircase), assembly of the tubular scaffolding on the facades and roofs of the building, structural reinforcements, disassembly of the tiled roofs, assembly of pinnacles manufactured in the workshop, restoration of the facades, works inside the building, cladding and interior partitions, installations, cladding and carpentry, exterior urbanization works, reinforced concrete floor, execution of the pavements, cladding and placement of the furniture foreseen in the project.

Phase 2

Phase 2 will start with the beginning of the phase 1 urbanization works, as well as the final works of installations and finishes inside the main building.

During this phase, the dismantling of the prefabricated modules of the classrooms and their provisional facilities will be carried out, the pavements of the sports court will be replaced and demolitions will be carried out in the urbanization of walls and floors. On the other hand, the excavation of land will begin for the execution of the foundation of the new gym.

The area, once the works are finished, will be made up of: gymnasium, transformation center, administration area (archive, offices, counselor's office, teachers' room and toilets), cafeteria, seminars, multifunctional room, library, secondary classrooms, high school classrooms, laboratories, multipurpose classrooms, management classrooms, new covered porch, and 2 sports courts.

Through this action, the different floors of the building will be redistributed to improve its functionality, while maintaining the original design scheme, as reported by the Board. Also, the current assembly hall will be converted for use as a multifunctional room, so that it can host conferences, study/library space and projections. Work will also be done on the institute's archive, whose funds have a high documentary and historical value, to facilitate access for the study and consultation of documents and provide it with fire protection systems.

This action, which has European co-financing through the European Regional Development Fund (Feder), is included in the Plan for Investments in Educational Infrastructures of the Andalusian Ministry of Education and Sport, which is executed through the Andalusian Public Education Agency. [22] [23]

Multimedia gallery of the High School

Bibliography

  • GONZÁLEZ MARQUEZ, Juan Antonio (2007). Diputación Provincial de Huelva, ed. El Instituto La Rábida. 150 años de Educación y Cultura en Huelva. ISBN  978-84-8163-427-3.

References

  1. ^ a b c "La Rábida High School (Huelva), distinguished as a Historical Institute of Education of Andalusia". Huelva Buenas Noticias, Periódico digital de Huelva y provincia centrado en informaciones positivas (in European Spanish). 2018-03-31. Retrieved 2018-04-01.
  2. ^ a b "La Rábida High School, a benchmark in Huelva education and architecture (In Spanish)". Huelva Buenas Noticias, Periódico digital de Huelva y provincia centrado en informaciones positivas (in European Spanish). 2014-10-23. Retrieved 2017-11-11.
  3. ^ a b c GONZÁLEZ MÁRQUEZ, Juan Antonio (2007). IES La Rábida (PDF). Huelva: Ruta del patrimonio educativo andaluz, INSTITUTOS CON HISTORIA (In Spanish). ISBN  978-84-8163-427-3. Retrieved November 11, 2017.
  4. ^ Márquez, Carmen (2016-12-02). "Antonia Arrobas, the student who broke down barriers (in Spanish)". Cadena SER (in European Spanish). Retrieved 2017-11-11.
  5. ^ 20Minutos. "They pay homage to the student who opened the access of the woman to the Baccalaureate in Spain (in Spanish) - 20minutos.es". 20minutos.es - Últimas Noticias. Retrieved 2017-11-11.{{ cite news}}: CS1 maint: numeric names: authors list ( link)
  6. ^ "The Town Hall of Huelva inaugurates on Monday a new monument to Juan Ramón Jiménez on the 125th anniversary of his birth" (in European Spanish). Europa Press. 2007-03-02. Retrieved 2017-11-11.
  7. ^ Información, Huelva (2022-02-28). "La Rábida High School enters the Order of Alfonso X El Sabio for its educational work". Huelva Información (in European Spanish). Retrieved 2022-03-07.
  8. ^ "Tender for the project for the modernization work of La Rábida High School (In Spanish)". Huelva Buenas Noticias, Periódico digital de Huelva y provincia centrado en informaciones positivas. 2016-07-26. Retrieved 2017-04-29.
  9. ^ "Eight million for the reform and integral rehabilitation of La Rábida High School". huelvaya.es (in Spanish). 2014-12-02. Retrieved 2022-03-07.
  10. ^ Información, Huelva (2017-02-28). "The project for the reform of La Rábida High School will be in five months". Huelva Información (in European Spanish). Retrieved 2022-03-07.
  11. ^ "La Rábida High School, evicted after suffering floods". Huelva24 (in Spanish). Retrieved 2017-11-06.
  12. ^ Información, Huelva (2017-11-09). "The Andalusian Government does not guarantee the start date of the works of La Rábida High School". Huelva Información (in European Spanish). Retrieved 2022-03-07.
  13. ^ Información, Huelva (2017-11-11). "Fails at La Rábida High School". Huelva Información (in European Spanish). Retrieved 2022-03-07.
  14. ^ huelva24.com. "The new school of 'El Ensanche' and the reforms of La Rábida High School and Alto Conquero High School, millionaire investments for education". Huelva24 | Toda la información y noticias de Huelva (in Spanish). Retrieved 2022-03-07.{{ cite web}}: CS1 maint: numeric names: authors list ( link)
  15. ^ "Minutes of the Ordinary Session of the Provincial School Council of February 2, 2018" (PDF). Dropbox (in Spanish). Retrieved 2018-12-12.
  16. ^ "Constructions confirmed at La Rábida High School". Huelva's newspaper (in European Spanish). 2019-03-25. Retrieved 2019-04-03.
  17. ^ "Log into Facebook". Facebook. Retrieved 2022-03-07. {{ cite web}}: Cite uses generic title ( help)
  18. ^ "Log into Facebook". Facebook. Retrieved 2022-03-07. {{ cite web}}: Cite uses generic title ( help)
  19. ^ "Log into Facebook". Facebook. Retrieved 2022-03-07. {{ cite web}}: Cite uses generic title ( help)
  20. ^ Información, Huelva (2020-08-15). "Workers install prefabricated classrooms to start the reform of La Rábida High School in Huelva". Huelva Información (in European Spanish). Retrieved 2020-11-19.
  21. ^ Información, Huelva (2022-01-14). "La Rábida High School's works are at 55% and will be reopened on 2022 September 21". Huelva Información (in European Spanish). Retrieved 2022-03-07.
  22. ^ Información, Huelva (2020-06-06). "The Andalusian Government awards the works at La Rábida High School for 6.2 million euros". Huelva Información (in European Spanish). Retrieved 2020-06-06.
  23. ^ "Education awards the reform works of La Rábida High School". Huelva Ya noticias periódico digital de la provincia de Huelva (in Spanish). 2020-06-05. Retrieved 2020-06-06.

Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook