![]() | You can help expand this article with text translated from
the corresponding article in French. (January 2021) Click [show] for important translation instructions.
|
The LGV Poitiers鈥揕imoges was an approximately 100 km-long (62 mi) French high-speed rail project reserved for passenger traffic between Poitiers and Limoges. It was considered since 1990's, with a serious project studied and revealed in 2006. Interestingly, this high-speed rail was planned to be mostly single track only.
Its dual aim was:
Construction was due to start in 2014 but had been brought back to beyond 2030. The project was finally cancelled in 2017, under the new administration of President Emmanuel Macron.
![]() | You can help expand this article with text translated from
the corresponding article in French. (January 2021) Click [show] for important translation instructions.
|
The LGV Poitiers鈥揕imoges was an approximately 100 km-long (62 mi) French high-speed rail project reserved for passenger traffic between Poitiers and Limoges. It was considered since 1990's, with a serious project studied and revealed in 2006. Interestingly, this high-speed rail was planned to be mostly single track only.
Its dual aim was:
Construction was due to start in 2014 but had been brought back to beyond 2030. The project was finally cancelled in 2017, under the new administration of President Emmanuel Macron.