HillTopper Wind Farm | |
---|---|
| |
Country | USA |
Location | Logan County, Illinois |
Coordinates | 39°57′40″N 89°17′30″W / 39.96111°N 89.29167°W |
Status | Active |
Construction began | April 9, 2018 |
Owner(s) | Enel Green Power |
Wind farm | |
Type | Onshore |
Power generation | |
Units operational | 74 x 2.5 mW |
Storage capacity | 185 MW |
External links | |
Website | https://www.enelgreenpower.com |
The HillTopper Wind Farm is a 74-turbine wind farm near Mount Pulaski in southeastern Logan County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 185 megawatts of electricity. [1] The complex was completed by Enel Green Power at a cost of approximately $325 million, and entered operations in 2018. [2]
The HillTopper complex's 74 wind turbines are each rated at 2.5 mW. [3] The project's overall 185-mW capacity was pre-sold to Bloomberg LP, Danone North America, General Motors, and Starbucks. [1] The complex utilizes leasehold rights to 7,500 acres of land. [2]
HillTopper Wind Farm | |
---|---|
| |
Country | USA |
Location | Logan County, Illinois |
Coordinates | 39°57′40″N 89°17′30″W / 39.96111°N 89.29167°W |
Status | Active |
Construction began | April 9, 2018 |
Owner(s) | Enel Green Power |
Wind farm | |
Type | Onshore |
Power generation | |
Units operational | 74 x 2.5 mW |
Storage capacity | 185 MW |
External links | |
Website | https://www.enelgreenpower.com |
The HillTopper Wind Farm is a 74-turbine wind farm near Mount Pulaski in southeastern Logan County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 185 megawatts of electricity. [1] The complex was completed by Enel Green Power at a cost of approximately $325 million, and entered operations in 2018. [2]
The HillTopper complex's 74 wind turbines are each rated at 2.5 mW. [3] The project's overall 185-mW capacity was pre-sold to Bloomberg LP, Danone North America, General Motors, and Starbucks. [1] The complex utilizes leasehold rights to 7,500 acres of land. [2]