Beijing Subway station | ||||||||||||||||
![]() Line 17 platform billboard in December 2023 | ||||||||||||||||
General information | ||||||||||||||||
Location | Interchange of
Gongrentiyuchang North Road, Xindong Road (新东路) and
Gongrentiyuchang East Road Sanlitun, Chaoyang, Beijing China | |||||||||||||||
Coordinates | 39°55′56″N 116°26′38″E / 39.932233°N 116.443770°E | |||||||||||||||
Operated by |
Beijing Mass Transit Railway Operation Corporation Limited (Line 3) Beijing MTR (Line 17) | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | December 30, 2023 (Line 17) | |||||||||||||||
Opening | 2024 (Line 3) | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Workers' Stadium station ( Chinese: 工人体育场站; pinyin: Gōngrén Tǐyùchǎng Zhàn, also known as Gongrentiyuchɑng Zhɑn) is an interchange station between Lines 3 and 17 of Beijing Subway, of which the Line 17 part opened on 30 December 2023 [1] [2] and the Line 3 part will open in 2024. The Line 17 station will be the southern terminus of the northern section of the line until it connects to the south section at Shilihe in 2025.
The construction of the station started in November 2018. [3] The station is planned to be the interchange station between Line 3 and Line 17. The Line 3 part and the Line 17 part were constructed at the same time.
The structure of the station was completed in March 2023, [4] the Line 17 service between this station and Future Science City North started operations on December 30, 2023 [2] and the Line 3 service of the station will start in 2024. The Line 17 section between this station and Shilihe is planned to open no earlier than 2025.
Both the Line 3 and Line 17 stations have underground island platforms. The two lines will share their concourse.
There are 7 exits, [4] currently only Exits C, D and F are operational. Exit C leads to Xindong Road, D to Gongrentiyuchang North Road and F to Workers' Stadium at Gongrentiyuchang East Road. Exit F is accessible.
2023年12月30日(周六)首班车起,地铁17号线北段(工人体育场—未来科学城北)、16号线剩余段(榆树庄—宛平城)及苏州街站、11号线西段剩余段(金安桥—模式口)开通试运营
Beijing Subway station | ||||||||||||||||
![]() Line 17 platform billboard in December 2023 | ||||||||||||||||
General information | ||||||||||||||||
Location | Interchange of
Gongrentiyuchang North Road, Xindong Road (新东路) and
Gongrentiyuchang East Road Sanlitun, Chaoyang, Beijing China | |||||||||||||||
Coordinates | 39°55′56″N 116°26′38″E / 39.932233°N 116.443770°E | |||||||||||||||
Operated by |
Beijing Mass Transit Railway Operation Corporation Limited (Line 3) Beijing MTR (Line 17) | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | December 30, 2023 (Line 17) | |||||||||||||||
Opening | 2024 (Line 3) | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Workers' Stadium station ( Chinese: 工人体育场站; pinyin: Gōngrén Tǐyùchǎng Zhàn, also known as Gongrentiyuchɑng Zhɑn) is an interchange station between Lines 3 and 17 of Beijing Subway, of which the Line 17 part opened on 30 December 2023 [1] [2] and the Line 3 part will open in 2024. The Line 17 station will be the southern terminus of the northern section of the line until it connects to the south section at Shilihe in 2025.
The construction of the station started in November 2018. [3] The station is planned to be the interchange station between Line 3 and Line 17. The Line 3 part and the Line 17 part were constructed at the same time.
The structure of the station was completed in March 2023, [4] the Line 17 service between this station and Future Science City North started operations on December 30, 2023 [2] and the Line 3 service of the station will start in 2024. The Line 17 section between this station and Shilihe is planned to open no earlier than 2025.
Both the Line 3 and Line 17 stations have underground island platforms. The two lines will share their concourse.
There are 7 exits, [4] currently only Exits C, D and F are operational. Exit C leads to Xindong Road, D to Gongrentiyuchang North Road and F to Workers' Stadium at Gongrentiyuchang East Road. Exit F is accessible.
2023年12月30日(周六)首班车起,地铁17号线北段(工人体育场—未来科学城北)、16号线剩余段(榆树庄—宛平城)及苏州街站、11号线西段剩余段(金安桥—模式口)开通试运营