Golden Hills Wind Project | |
---|---|
| |
Country | United States |
Location | Sherman County, Oregon |
Coordinates | 45°35′21″N 120°44′12″W / 45.58917°N 120.73667°W |
Status | Commissioned 2022 |
Owner(s) | BP Alternative Energy |
Power generation | |
Units operational | 41 x 4.3 MW Vestas V150 10 x 2.5 MW GE 116 |
Nameplate capacity | 200 megawatts |
Golden Hills Wind Project is a electricity generating wind farm facility in Sherman County, Oregon. [1] The original plan in 2009 by BP Alternative Energy was to generate a peak of 400 megawatts, with an average of 133 MW of wind power across 200,000 acres (81,000 ha) using up to 267 wind turbines. [2] [3] A new plan with 51 turbines generating 200 MW was expected to begin construction in 2021. [4] It began operation in 2022. [5]
Golden Hills Wind Project | |
---|---|
| |
Country | United States |
Location | Sherman County, Oregon |
Coordinates | 45°35′21″N 120°44′12″W / 45.58917°N 120.73667°W |
Status | Commissioned 2022 |
Owner(s) | BP Alternative Energy |
Power generation | |
Units operational | 41 x 4.3 MW Vestas V150 10 x 2.5 MW GE 116 |
Nameplate capacity | 200 megawatts |
Golden Hills Wind Project is a electricity generating wind farm facility in Sherman County, Oregon. [1] The original plan in 2009 by BP Alternative Energy was to generate a peak of 400 megawatts, with an average of 133 MW of wind power across 200,000 acres (81,000 ha) using up to 267 wind turbines. [2] [3] A new plan with 51 turbines generating 200 MW was expected to begin construction in 2021. [4] It began operation in 2022. [5]