History | |
---|---|
Italy | |
Name | GO 59 |
Builder | Cantiere Navale Giacalone di Mazara del Vallo ( Trapani) |
Cost | €7 million [2] |
Laid down | 2013 |
Launched | 2014 |
Acquired | 2011 |
Commissioned | march 2014 |
In service | 1 |
Homeport | Brindisi [1] |
General characteristics | |
Type | Floating dry dock |
Length | |
Beam |
|
Draught | 8.0 m (26 ft 3 in) (max)Error: has synonymous parameter ( help) |
Draft | 9.5 m (31 ft 2 in) (max)Error: has synonymous parameter ( help) |
Propulsion |
|
Notes | lifting capability 1.000 t (0.984 long tons) |
GO 59 is a Floating dry dock of the Marina Militare. [4]
Delivered to Arsenale Militare Marittimo di
Augusta on 26 March 2014,
[5]
[6] it was transferred to Stazione Navale di
Brindisi on 24 February 2016.
[7]
These are the technical specifications of MM for its realization.
History | |
---|---|
Italy | |
Name | GO 59 |
Builder | Cantiere Navale Giacalone di Mazara del Vallo ( Trapani) |
Cost | €7 million [2] |
Laid down | 2013 |
Launched | 2014 |
Acquired | 2011 |
Commissioned | march 2014 |
In service | 1 |
Homeport | Brindisi [1] |
General characteristics | |
Type | Floating dry dock |
Length | |
Beam |
|
Draught | 8.0 m (26 ft 3 in) (max)Error: has synonymous parameter ( help) |
Draft | 9.5 m (31 ft 2 in) (max)Error: has synonymous parameter ( help) |
Propulsion |
|
Notes | lifting capability 1.000 t (0.984 long tons) |
GO 59 is a Floating dry dock of the Marina Militare. [4]
Delivered to Arsenale Militare Marittimo di
Augusta on 26 March 2014,
[5]
[6] it was transferred to Stazione Navale di
Brindisi on 24 February 2016.
[7]
These are the technical specifications of MM for its realization.