Nanning Ring Expressway | ||||
---|---|---|---|---|
南宁绕城高速公路 | ||||
南宁绕城高速 | ||||
Route information | ||||
Length | 82 km (51 mi) | |||
Existed | 2003–present | |||
Location | ||||
Country | China | |||
Highway system | ||||
|
The Nanning Ring Expressway ( Chinese: 南宁绕城高速公路), designated as G7201, is a ring expressway in Nanning, Guangxi, China. The Nanning Ring Expressway is composed of 3 sections, with a total length of 82 kilometers. The whole expressway was opened to traffic on 28 December 2003. [1]
Construction of southeastern section started in 1996 and was completed and opened to traffic on 8 December 1998. This section is a two-way six-lane expressway with a design speed of 120 km/h. [2]
The western section is a two-way four-lane expressway with a design speed of 100 km/h. Construction started in 2001 and was completed and opened to traffic in December 2003. [3]
Construction of the northeastern section started in 2001 and was completed and opened to traffic in December 2003. This section is a two-way four-lane expressway with a design speed of 100 km/h. [4]
Nanning Ring Expressway | ||||
---|---|---|---|---|
南宁绕城高速公路 | ||||
南宁绕城高速 | ||||
Route information | ||||
Length | 82 km (51 mi) | |||
Existed | 2003–present | |||
Location | ||||
Country | China | |||
Highway system | ||||
|
The Nanning Ring Expressway ( Chinese: 南宁绕城高速公路), designated as G7201, is a ring expressway in Nanning, Guangxi, China. The Nanning Ring Expressway is composed of 3 sections, with a total length of 82 kilometers. The whole expressway was opened to traffic on 28 December 2003. [1]
Construction of southeastern section started in 1996 and was completed and opened to traffic on 8 December 1998. This section is a two-way six-lane expressway with a design speed of 120 km/h. [2]
The western section is a two-way four-lane expressway with a design speed of 100 km/h. Construction started in 2001 and was completed and opened to traffic in December 2003. [3]
Construction of the northeastern section started in 2001 and was completed and opened to traffic in December 2003. This section is a two-way four-lane expressway with a design speed of 100 km/h. [4]