Original file (4,574 × 3,146 pixels, file size: 1.55 MB, MIME type: image/jpeg)
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 01:49, 22 February 2008 | 4,574 × 3,146 (1.55 MB) | Achim Hering | {{Information |Description= Concrete floor penetrations, next to a drywall wall assembly prior to taping, as seen from underneath, with plastic, copper and steel piping. Plastic pipe penetrations are fitted with 3M FS195 wrap strips, ei |
The following other wikis use this file:
Original file (4,574 × 3,146 pixels, file size: 1.55 MB, MIME type: image/jpeg)
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 01:49, 22 February 2008 | 4,574 × 3,146 (1.55 MB) | Achim Hering | {{Information |Description= Concrete floor penetrations, next to a drywall wall assembly prior to taping, as seen from underneath, with plastic, copper and steel piping. Plastic pipe penetrations are fitted with 3M FS195 wrap strips, ei |
The following other wikis use this file: