Original file (5,568 × 3,712 pixels, file size: 3.03 MB, MIME type: image/jpeg)
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 17:39, 14 December 2018 |
![]() | 5,568 × 3,712 (3.03 MB) | Ras67 | {{Information |Description={{en|1=The completed Space Launch System core stage in the South Vertical Assembly Building of NASA's Rocket Factory * The 149-foot-long Space Launch System liquid hydrogen tank structural test article is almost as large as the entire space shuttle external tank. Engineers assembled the tank and two simulators vertically at NASA’s Michoud Assembly Facility in New Orleans. Then they lifted it with large cranes to break it over, or lower it, onto special transporters,... |
The following other wikis use this file:
Original file (5,568 × 3,712 pixels, file size: 3.03 MB, MIME type: image/jpeg)
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 17:39, 14 December 2018 |
![]() | 5,568 × 3,712 (3.03 MB) | Ras67 | {{Information |Description={{en|1=The completed Space Launch System core stage in the South Vertical Assembly Building of NASA's Rocket Factory * The 149-foot-long Space Launch System liquid hydrogen tank structural test article is almost as large as the entire space shuttle external tank. Engineers assembled the tank and two simulators vertically at NASA’s Michoud Assembly Facility in New Orleans. Then they lifted it with large cranes to break it over, or lower it, onto special transporters,... |
The following other wikis use this file: