Expressway S12 | ||||
---|---|---|---|---|
Droga ekspresowa S12 | ||||
Route information | ||||
Part of E373 | ||||
Length | 86.2 km (53.6 mi) plus 2 km single carriageway, 328 km (204 mi) planned | |||
Major junctions | ||||
West end | A1 near Piotrków Trybunalski | |||
S7 near
Radom (planned)
S17 merge near
Puławy | ||||
East end | M 07 at the Ukrainian border | |||
Location | ||||
Country | Poland | |||
Regions | Łódź Voivodeship, Masovian Voivodeship, Lublin Voivodeship | |||
Major cities | Radom, Lublin | |||
Highway system | ||||
|
Expressway S12 or express road S12 (in Polish droga ekspresowa S12) is a Polish highway planned to run from a junction with the A1 highway near Piotrków Trybunalski to a border crossing with Ukraine at Dorohusk, passing by Radom, Lublin and Chełm. The completed road should be about 328 km (204 mi) long. As of 2023 the portion open to traffic runs from Puławy through Lublin to Piaski.
A document outlining the future development of transport infrastructure issued by the Polish government in December 2022 projects that the road would be fully completed in 2030, however the majority of the section from Lublin to Ukrainian border will be opened in years 2024 – 2027. [3] [4]
Expressway S12 | ||||
---|---|---|---|---|
Droga ekspresowa S12 | ||||
Route information | ||||
Part of E373 | ||||
Length | 86.2 km (53.6 mi) plus 2 km single carriageway, 328 km (204 mi) planned | |||
Major junctions | ||||
West end | A1 near Piotrków Trybunalski | |||
S7 near
Radom (planned)
S17 merge near
Puławy | ||||
East end | M 07 at the Ukrainian border | |||
Location | ||||
Country | Poland | |||
Regions | Łódź Voivodeship, Masovian Voivodeship, Lublin Voivodeship | |||
Major cities | Radom, Lublin | |||
Highway system | ||||
|
Expressway S12 or express road S12 (in Polish droga ekspresowa S12) is a Polish highway planned to run from a junction with the A1 highway near Piotrków Trybunalski to a border crossing with Ukraine at Dorohusk, passing by Radom, Lublin and Chełm. The completed road should be about 328 km (204 mi) long. As of 2023 the portion open to traffic runs from Puławy through Lublin to Piaski.
A document outlining the future development of transport infrastructure issued by the Polish government in December 2022 projects that the road would be fully completed in 2030, however the majority of the section from Lublin to Ukrainian border will be opened in years 2024 – 2027. [3] [4]