PhotosLocation


ellsworth+power+house+and+dam Latitude and Longitude:

44°32′39″N 68°25′50″W / 44.54417°N 68.43056°W / 44.54417; -68.43056
From Wikipedia, the free encyclopedia

Ellsworth Power House and Dam
Ellsworth Power House and Dam is located in Maine
Ellsworth Power House and Dam
Ellsworth Power House and Dam is located in the United States
Ellsworth Power House and Dam
LocationUnion River, Ellsworth, Maine
Coordinates 44°32′39″N 68°25′50″W / 44.54417°N 68.43056°W / 44.54417; -68.43056
Area2 acres (0.81 ha)
Built1907 (1907)
EngineerJames L. Leonard
Architectural styleRenaissance, Ambursen type
NRHP reference  No. 85001262 [1]
Added to NRHPJune 20, 1985

The Ellsworth Power House and Dam is a hydroelectric power generation facility on the Union River in Ellsworth, Maine. [2] The dam, located just north of downtown Ellsworth, is also known as the Union River Dam, [3] and impounds the river to create Leonard Lake, [4] named for project's engineer, James Leonard.[ citation needed] The powerhouse is a Renaissance Revival building located at the western end of the dam.[ citation needed] The power plant, built in 1907, [3] was one of the first peaking power plants built in the state, and the hollow concrete dam is one of the highest hollow (or Ambursen-type) buttress dams ever built, having been described as "the highest power dam in New England" in 1928. [2] [5] The facility was nominated for the National Register of Historic Places in 1985, [2] where it is currently listed. [3]

Description

The Ellsworth Dam is located between two bluffs which flank Maine's Union River, and rise to a height of more than 100 feet (30 m). [2] The dam consists of a series of buttresses, each set on a schist bedrock ledge, three feet thick, and spaced about 15 feet (4.6 m) apart, which provide support for two large slabs of steel-reinforced concrete that span the river between the bluffs. [2] [5] The dam is 71 feet (22 m) in height, with a spillway 60 feet (18 m) long. [2] The schist ledge ensures the longevity of the dam.[ clarification needed] [5]

The power station is located at the base of the dam on the west bank of the river. [2] It is a 1+12-story structure built out of concrete blocks, with a red tile gabled roof. [2] The Renaissance Revival[ citation needed][ clarification needed] structure has round-arch windows which are connected by a stone belt course, and there are Palladian windows in the gable ends. [2] An addition on the building's rear was built with similar styling. [2]

The Ellsworth Dam produces 29,907 megawatt-hours per year as of 2012, [4] and is licensed to supply about 30,000 megawatt-hours per year, which is 1% of Maine's hydropower. [3] It is one of the 118 power-generating dams in Maine as of 2016. [3] The flow of water at the Ellsworth Dam is controlled by the Graham Lake Dam, which created Graham Lake. [4]

History

The power station was built in 1907 by the Bar Harbor and Union River Power Company, to designs by its engineer, James Leonard. [2] The company was merged in 1925 into the Bangor Hydro-Electric Company, [2] now part of Emera.[ citation needed] Later, the plant was sold to Penobscot Hydro[ clarification needed], and then to PPL in 1999[ clarification needed]. [4] The plant was acquired by Black Bear Hydro in 2009 from PPL, [4] and sold to Brookfield Partners in 2014.[ citation needed]

The dam was in the process of being relicensed as of 2012; its most recent permit, issued by the Federal Energy Regulatory Commission in 1987, was due to expire in 2017. [4] However, public concern about fish passage and water quality, caused the Federal Energy Regulatory Commission to delay issuing a new permit.[ citation needed] The new expiration date is April 2020.[ citation needed]

(The dam is no longer hollow. During the 1990s. the FERC required installation of post-tensioned anchors deep into ledge and the filling of the hollow dam with concrete, in order to increase dam safety.)[ citation needed]

See also

References

  1. ^ "National Register Information System – (#85001262)". National Register of Historic Places. National Park Service. July 9, 2010.
  2. ^ a b c d e f g h i j k l "NRHP nomination for Ellsworth Power House and Dam". National Park Service. May 22, 1985. Retrieved April 20, 2021.
  3. ^ a b c d e "The Union River Dam". The Ellsworth American. December 9, 2016. Retrieved April 20, 2021.
  4. ^ a b c d e f "Company begins five-year effort to relicense Ellsworth hydroelectric dam". Bangor Daily News. August 29, 2012. Retrieved February 5, 2015.
  5. ^ a b c "Ellsworth". Maine: An Encyclopedia. November 21, 2011. Retrieved April 20, 2021.

ellsworth+power+house+and+dam Latitude and Longitude:

44°32′39″N 68°25′50″W / 44.54417°N 68.43056°W / 44.54417; -68.43056
From Wikipedia, the free encyclopedia

Ellsworth Power House and Dam
Ellsworth Power House and Dam is located in Maine
Ellsworth Power House and Dam
Ellsworth Power House and Dam is located in the United States
Ellsworth Power House and Dam
LocationUnion River, Ellsworth, Maine
Coordinates 44°32′39″N 68°25′50″W / 44.54417°N 68.43056°W / 44.54417; -68.43056
Area2 acres (0.81 ha)
Built1907 (1907)
EngineerJames L. Leonard
Architectural styleRenaissance, Ambursen type
NRHP reference  No. 85001262 [1]
Added to NRHPJune 20, 1985

The Ellsworth Power House and Dam is a hydroelectric power generation facility on the Union River in Ellsworth, Maine. [2] The dam, located just north of downtown Ellsworth, is also known as the Union River Dam, [3] and impounds the river to create Leonard Lake, [4] named for project's engineer, James Leonard.[ citation needed] The powerhouse is a Renaissance Revival building located at the western end of the dam.[ citation needed] The power plant, built in 1907, [3] was one of the first peaking power plants built in the state, and the hollow concrete dam is one of the highest hollow (or Ambursen-type) buttress dams ever built, having been described as "the highest power dam in New England" in 1928. [2] [5] The facility was nominated for the National Register of Historic Places in 1985, [2] where it is currently listed. [3]

Description

The Ellsworth Dam is located between two bluffs which flank Maine's Union River, and rise to a height of more than 100 feet (30 m). [2] The dam consists of a series of buttresses, each set on a schist bedrock ledge, three feet thick, and spaced about 15 feet (4.6 m) apart, which provide support for two large slabs of steel-reinforced concrete that span the river between the bluffs. [2] [5] The dam is 71 feet (22 m) in height, with a spillway 60 feet (18 m) long. [2] The schist ledge ensures the longevity of the dam.[ clarification needed] [5]

The power station is located at the base of the dam on the west bank of the river. [2] It is a 1+12-story structure built out of concrete blocks, with a red tile gabled roof. [2] The Renaissance Revival[ citation needed][ clarification needed] structure has round-arch windows which are connected by a stone belt course, and there are Palladian windows in the gable ends. [2] An addition on the building's rear was built with similar styling. [2]

The Ellsworth Dam produces 29,907 megawatt-hours per year as of 2012, [4] and is licensed to supply about 30,000 megawatt-hours per year, which is 1% of Maine's hydropower. [3] It is one of the 118 power-generating dams in Maine as of 2016. [3] The flow of water at the Ellsworth Dam is controlled by the Graham Lake Dam, which created Graham Lake. [4]

History

The power station was built in 1907 by the Bar Harbor and Union River Power Company, to designs by its engineer, James Leonard. [2] The company was merged in 1925 into the Bangor Hydro-Electric Company, [2] now part of Emera.[ citation needed] Later, the plant was sold to Penobscot Hydro[ clarification needed], and then to PPL in 1999[ clarification needed]. [4] The plant was acquired by Black Bear Hydro in 2009 from PPL, [4] and sold to Brookfield Partners in 2014.[ citation needed]

The dam was in the process of being relicensed as of 2012; its most recent permit, issued by the Federal Energy Regulatory Commission in 1987, was due to expire in 2017. [4] However, public concern about fish passage and water quality, caused the Federal Energy Regulatory Commission to delay issuing a new permit.[ citation needed] The new expiration date is April 2020.[ citation needed]

(The dam is no longer hollow. During the 1990s. the FERC required installation of post-tensioned anchors deep into ledge and the filling of the hollow dam with concrete, in order to increase dam safety.)[ citation needed]

See also

References

  1. ^ "National Register Information System – (#85001262)". National Register of Historic Places. National Park Service. July 9, 2010.
  2. ^ a b c d e f g h i j k l "NRHP nomination for Ellsworth Power House and Dam". National Park Service. May 22, 1985. Retrieved April 20, 2021.
  3. ^ a b c d e "The Union River Dam". The Ellsworth American. December 9, 2016. Retrieved April 20, 2021.
  4. ^ a b c d e f "Company begins five-year effort to relicense Ellsworth hydroelectric dam". Bangor Daily News. August 29, 2012. Retrieved February 5, 2015.
  5. ^ a b c "Ellsworth". Maine: An Encyclopedia. November 21, 2011. Retrieved April 20, 2021.

Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook