PhotosLocation


east+valenzuela+station Latitude and Longitude:

14°42′04″N 121°00′58″E / 14.70120°N 121.01609°E / 14.70120; 121.01609
From Wikipedia, the free encyclopedia
East Valenzuela
  MMS 
East Valenzuela station construction along Mindanao Avenue Extension-Ugong Crossing
General information
Location Mindanao Avenue
Ugong, Valenzuela, Metro Manila
Coordinates 14°42′04″N 121°00′58″E / 14.70120°N 121.01609°E / 14.70120; 121.01609
Owned by Department of Transportation
Operated byDepartment of Transportation
Line(s)      Metro Manila Subway
Construction
Structure typeUnderground
Other information
StatusUnder construction
History
Opened2025 (partial)
Services
Preceding station Manila MRT Following station
Terminus Metro Manila Subway Quirino Highway

East Valenzuela station is an under-construction Metro Manila Subway station located along Mindanao Avenue, Valenzuela, Metro Manila. It will be the northern terminus of the line. [1] [2]

References

  1. ^ Camus, Miguel (September 6, 2021). "DOTr: Metro Manila Subway now 26% complete". Philippine Daily Inquirer. Retrieved October 26, 2021.
  2. ^ "Metro Manila Subway East Valenzuela as of August 2021". 8 August 2021.

east+valenzuela+station Latitude and Longitude:

14°42′04″N 121°00′58″E / 14.70120°N 121.01609°E / 14.70120; 121.01609
From Wikipedia, the free encyclopedia
East Valenzuela
  MMS 
East Valenzuela station construction along Mindanao Avenue Extension-Ugong Crossing
General information
Location Mindanao Avenue
Ugong, Valenzuela, Metro Manila
Coordinates 14°42′04″N 121°00′58″E / 14.70120°N 121.01609°E / 14.70120; 121.01609
Owned by Department of Transportation
Operated byDepartment of Transportation
Line(s)      Metro Manila Subway
Construction
Structure typeUnderground
Other information
StatusUnder construction
History
Opened2025 (partial)
Services
Preceding station Manila MRT Following station
Terminus Metro Manila Subway Quirino Highway

East Valenzuela station is an under-construction Metro Manila Subway station located along Mindanao Avenue, Valenzuela, Metro Manila. It will be the northern terminus of the line. [1] [2]

References

  1. ^ Camus, Miguel (September 6, 2021). "DOTr: Metro Manila Subway now 26% complete". Philippine Daily Inquirer. Retrieved October 26, 2021.
  2. ^ "Metro Manila Subway East Valenzuela as of August 2021". 8 August 2021.

Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook