PhotosLocation


drežnik+viaduct Latitude and Longitude:

45°30′37″N 15°31′32″E / 45.510317°N 15.525484°E / 45.510317; 15.525484
From Wikipedia, the free encyclopedia
Drežnik Viaduct
The southern approach to the Drežnik Viaduct
Coordinates 45°30′37″N 15°31′32″E / 45.510317°N 15.525484°E / 45.510317; 15.525484
CarriesRoad vehicles
Crosses Kupa River and Karlovac suburbs
LocaleCentral Croatia
Official nameViadukt Drežnik
Maintained by Hrvatske autoceste
Characteristics
Design Beam bridge
Total length2485 m
Width2 x 10.5 m
Longest span70 m
History
Opened2001
Statistics
Tollcharged as a part of A1 motorway toll
Location

The Drežnik Viaduct is located in Karlovac, Croatia, immediately to the west of the Karlovac interchange on the A1 motorway. It is the longest viaduct in Croatia, spanning 2,485 metres (8,153 ft). It is executed in seven segments (225 m (738 ft)+270 m (890 ft)+4x408 m (1,339 ft)+358 m (1,175 ft) long), separated by expansion joints. [1] The viaduct was constructed by Konstruktor, Split, as the main contractor, and Viadukt and Hidroelektra of Zagreb as subcontractors in 2000 and 2001. [2] [3] [4]

The viaduct is executed as two parallel structures, each 10.5 m (34 ft) wide. Their superstructures are continuous structures with spans of 35 metres (115 ft) to 70 metres (230 ft) m above Kupa River. The carriageway of each of the bridges consists of two traffic lanes 3.75 metres (12.3 ft) wide and two marginal strips 1 metre (3.3 ft) wide. There are no sidewalks and no emergency lanes on the bridge itself. The superstructure is executed in I-section prefabricated reinforced concrete girders, made monolithic with in situ executed transverse beams and the deck slab. The longitudinal girders are mostly of a uniform length (traversing 35 m (115 ft) spans), except for those spanning the river and the longest, 70 m (230 ft) long span. [5] Foundations of the viaduct are executed on piles. [3]

Cost of the construction works related to the Drežnik Viaduct was 250 million Croatian kuna. [2]

The Drežnik Viaduct is the largest and the most significant structure on the Karlovac - Bosiljevo 1 section of the A1 motorway, which carries the transit traffic between Zagreb in the north and Rijeka and Split in the south, and channels it away from the Karlovac city centre, dramatically reducing travel times between those cities and relieving traffic congestion from the D1 state road running through Karlovac, which was especially severe during summer seasons. [6]

Traffic volume

Traffic is regularly counted and reported by Hrvatske autoceste, operator of the viaduct and the A1 motorway where the structure is located, and published by Hrvatske ceste. [7] Substantial variations between annual ( AADT) and summer (ASDT) traffic volumes are attributed to the fact that the bridge carries substantial tourist traffic to the Adriatic resorts. The traffic count is performed using analysis of motorway toll ticket sales.

Drežnik Viaduct traffic volume
Road Counting site AADT ASDT Notes
A1 1804 Karlovac south 21,699 43,188 Between Karlovac and Bosiljevo 1 interchanges.

See also

References

  1. ^ "Drežnik Viaduct near Karlovac". Gradimo (in Croatian). July 29, 2009. Archived from the original on August 2, 2010. Retrieved August 28, 2010.
  2. ^ a b "Construction of Drežnik Viaduct". Croatian Radiotelevision (in Croatian). May 13, 1998. Archived from the original on February 17, 2013.
  3. ^ a b "Drežnik Viaduct - Rijeka - Zagreb Motorway". Viadukt (in Croatian). August 27, 2010.
  4. ^ "Drežnik Viaduct". Structurae. Retrieved August 16, 2013.
  5. ^ "HAC Monografija". Hrvatske autoceste (in Croatian). May 17, 2010. Archived from the original on February 18, 2011. Retrieved July 2, 2011.
  6. ^ "From Rijeka to Zagreb in 1 hour and 15 minutes". Slobodna Dalmacija (in Croatian). April 30, 2001.
  7. ^ "Traffic counting on the roadways of Croatia in 2009 - digest" (PDF). Hrvatske Ceste. May 1, 2010. Archived from the original (PDF) on 2011-07-21.

drežnik+viaduct Latitude and Longitude:

45°30′37″N 15°31′32″E / 45.510317°N 15.525484°E / 45.510317; 15.525484
From Wikipedia, the free encyclopedia
Drežnik Viaduct
The southern approach to the Drežnik Viaduct
Coordinates 45°30′37″N 15°31′32″E / 45.510317°N 15.525484°E / 45.510317; 15.525484
CarriesRoad vehicles
Crosses Kupa River and Karlovac suburbs
LocaleCentral Croatia
Official nameViadukt Drežnik
Maintained by Hrvatske autoceste
Characteristics
Design Beam bridge
Total length2485 m
Width2 x 10.5 m
Longest span70 m
History
Opened2001
Statistics
Tollcharged as a part of A1 motorway toll
Location

The Drežnik Viaduct is located in Karlovac, Croatia, immediately to the west of the Karlovac interchange on the A1 motorway. It is the longest viaduct in Croatia, spanning 2,485 metres (8,153 ft). It is executed in seven segments (225 m (738 ft)+270 m (890 ft)+4x408 m (1,339 ft)+358 m (1,175 ft) long), separated by expansion joints. [1] The viaduct was constructed by Konstruktor, Split, as the main contractor, and Viadukt and Hidroelektra of Zagreb as subcontractors in 2000 and 2001. [2] [3] [4]

The viaduct is executed as two parallel structures, each 10.5 m (34 ft) wide. Their superstructures are continuous structures with spans of 35 metres (115 ft) to 70 metres (230 ft) m above Kupa River. The carriageway of each of the bridges consists of two traffic lanes 3.75 metres (12.3 ft) wide and two marginal strips 1 metre (3.3 ft) wide. There are no sidewalks and no emergency lanes on the bridge itself. The superstructure is executed in I-section prefabricated reinforced concrete girders, made monolithic with in situ executed transverse beams and the deck slab. The longitudinal girders are mostly of a uniform length (traversing 35 m (115 ft) spans), except for those spanning the river and the longest, 70 m (230 ft) long span. [5] Foundations of the viaduct are executed on piles. [3]

Cost of the construction works related to the Drežnik Viaduct was 250 million Croatian kuna. [2]

The Drežnik Viaduct is the largest and the most significant structure on the Karlovac - Bosiljevo 1 section of the A1 motorway, which carries the transit traffic between Zagreb in the north and Rijeka and Split in the south, and channels it away from the Karlovac city centre, dramatically reducing travel times between those cities and relieving traffic congestion from the D1 state road running through Karlovac, which was especially severe during summer seasons. [6]

Traffic volume

Traffic is regularly counted and reported by Hrvatske autoceste, operator of the viaduct and the A1 motorway where the structure is located, and published by Hrvatske ceste. [7] Substantial variations between annual ( AADT) and summer (ASDT) traffic volumes are attributed to the fact that the bridge carries substantial tourist traffic to the Adriatic resorts. The traffic count is performed using analysis of motorway toll ticket sales.

Drežnik Viaduct traffic volume
Road Counting site AADT ASDT Notes
A1 1804 Karlovac south 21,699 43,188 Between Karlovac and Bosiljevo 1 interchanges.

See also

References

  1. ^ "Drežnik Viaduct near Karlovac". Gradimo (in Croatian). July 29, 2009. Archived from the original on August 2, 2010. Retrieved August 28, 2010.
  2. ^ a b "Construction of Drežnik Viaduct". Croatian Radiotelevision (in Croatian). May 13, 1998. Archived from the original on February 17, 2013.
  3. ^ a b "Drežnik Viaduct - Rijeka - Zagreb Motorway". Viadukt (in Croatian). August 27, 2010.
  4. ^ "Drežnik Viaduct". Structurae. Retrieved August 16, 2013.
  5. ^ "HAC Monografija". Hrvatske autoceste (in Croatian). May 17, 2010. Archived from the original on February 18, 2011. Retrieved July 2, 2011.
  6. ^ "From Rijeka to Zagreb in 1 hour and 15 minutes". Slobodna Dalmacija (in Croatian). April 30, 2001.
  7. ^ "Traffic counting on the roadways of Croatia in 2009 - digest" (PDF). Hrvatske Ceste. May 1, 2010. Archived from the original (PDF) on 2011-07-21.

Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook