Submission declined on 17 April 2024 by
Stuartyeates (
talk).
Where to get help
How to improve a draft
You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
|
Submission declined on 16 April 2024 by
Qcne (
talk). This submission does not appear to be written in
the formal tone expected of an encyclopedia article. Entries should be written from a
neutral point of view, and should refer to a range of
independent, reliable, published sources. Please rewrite your submission in a more encyclopedic format. Please make sure to avoid
peacock terms that promote the subject. Declined by
Qcne 42 days ago. |
White House Ugansa | |
---|---|
General information | |
Address | Plot 1636 BIOCK 405 Akright City, along
Entebbe–Kampala Expressway Uganda |
Coordinates | 0°10′0″N 32°30′52″E / 0.16667°N 32.51444°E |
Current tenants | Ham Group of Companies, Ham Agro-Processing Industries |
Construction started | December 13, 2019 |
Completed | September 21, 2021 |
Owner | Hamis Kiggundu |
Design and construction | |
Architect(s) | Christopher Omara Ivan Ssewankambo |
The White House Uganda is an architectural and business landmark in Uganda, modeled after the White House in Washington, D.C. [1] [2] Initiated by Ugandan entrepreneur Hamis Kiggundu, it functions both as a tourist attraction and the headquarters for Ham Agro-Processing Industries, among other ventures he owns. [3] [4] [5]
The Ugandan White House is Located in Akright City along the Entebbe–Kampala Expressway and is bordered by Namugongo Road to the north, the community of Bwebajja and Kampala–Entebbe Road to the east, Namulanda to the southeast, Palm Valley Golf and Country Club to the south, and the community of Sekiwunga. The coordinates of the neighborhood are:0°10'21.0"N, 32°31'06.0"E (Latitude:0.172504; Longitude:32.518333). [2] [6] [3]
The neighborhood is located about 21 kilometres (13 mi), northeast of the town of Entebbe, the nearest large town. [7] This is approximately 20 kilometres (12 mi), southwest of Kampala, the capital and largest city in the country. [8]
The project, inspired by the American presidential residence, was designed to serve both cultural and practical business purposes. [9] The construction of The White House Uganda represents a notable development in the country's architectural and business sectors. [10] It was intended to symbolize the modern aspirations of Ugandan entrepreneurship and economic growth. Once completed, the building became the central office for Kiggundu's business operations. [11] [12]
Construction Timeline
Construction of The White House Uganda began in December 2019 and was completed in September 2021. [13] [14]
{{
cite web}}
: CS1 maint: numeric names: authors list (
link)
Submission declined on 17 April 2024 by
Stuartyeates (
talk). This draft's references do not show that the subject
qualifies for a Wikipedia article. In summary, the draft needs multiple published sources that are:
Where to get help
How to improve a draft
You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
|
Submission declined on 16 April 2024 by
Qcne (
talk). This submission does not appear to be written in
the formal tone expected of an encyclopedia article. Entries should be written from a
neutral point of view, and should refer to a range of
independent, reliable, published sources. Please rewrite your submission in a more encyclopedic format. Please make sure to avoid
peacock terms that promote the subject. Declined by
Qcne 42 days ago. |
White House Ugansa | |
---|---|
General information | |
Address | Plot 1636 BIOCK 405 Akright City, along
Entebbe–Kampala Expressway Uganda |
Coordinates | 0°10′0″N 32°30′52″E / 0.16667°N 32.51444°E |
Current tenants | Ham Group of Companies, Ham Agro-Processing Industries |
Construction started | December 13, 2019 |
Completed | September 21, 2021 |
Owner | Hamis Kiggundu |
Design and construction | |
Architect(s) | Christopher Omara Ivan Ssewankambo |
The White House Uganda is an architectural and business landmark in Uganda, modeled after the White House in Washington, D.C. [1] [2] Initiated by Ugandan entrepreneur Hamis Kiggundu, it functions both as a tourist attraction and the headquarters for Ham Agro-Processing Industries, among other ventures he owns. [3] [4] [5]
The Ugandan White House is Located in Akright City along the Entebbe–Kampala Expressway and is bordered by Namugongo Road to the north, the community of Bwebajja and Kampala–Entebbe Road to the east, Namulanda to the southeast, Palm Valley Golf and Country Club to the south, and the community of Sekiwunga. The coordinates of the neighborhood are:0°10'21.0"N, 32°31'06.0"E (Latitude:0.172504; Longitude:32.518333). [2] [6] [3]
The neighborhood is located about 21 kilometres (13 mi), northeast of the town of Entebbe, the nearest large town. [7] This is approximately 20 kilometres (12 mi), southwest of Kampala, the capital and largest city in the country. [8]
The project, inspired by the American presidential residence, was designed to serve both cultural and practical business purposes. [9] The construction of The White House Uganda represents a notable development in the country's architectural and business sectors. [10] It was intended to symbolize the modern aspirations of Ugandan entrepreneurship and economic growth. Once completed, the building became the central office for Kiggundu's business operations. [11] [12]
Construction Timeline
Construction of The White House Uganda began in December 2019 and was completed in September 2021. [13] [14]
{{
cite web}}
: CS1 maint: numeric names: authors list (
link)
-
in-depth (not just passing mentions about the subject)
-
reliable
-
secondary
-
independent of the subject
Make sure you add references that meet these criteria before resubmitting. Learn about mistakes to avoid when addressing this issue. If no additional references exist, the subject is not suitable for Wikipedia.