Darlipali Super Thermal Power Station | |
---|---|
| |
Official name | NTPC |
Country | India |
Location | Sundargarh |
Coordinates | 21°52′57″N 83°57′31″E / 21.88250°N 83.95861°E |
Status | Under Construction |
Owner(s) | NTPC |
Operator(s) | |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Make and model | BHEL |
Nameplate capacity | 1600 MW |
Darlipali Super Thermal Power Station at Darlipali village in Sundargarh district in Indian state of Odisha. [1] The power plant is one of the coal based power plants of NTPC Limited. [2] Coal will be obtained from Dulanga and Pakri Barwadih Coal Block and water supply will be sourced from the Hirakund Reservoir on the Mahanadi River through a pipeline at over a distance of about 30.0 km from project site. Plant is under construction by Bharat Heavy Electrical Limited (BHEL), L&T Power.
Its planned capacity of 1600 MW (2x800 MW).
Unit Number | Capacity ( MW) | Date of Commissioning | Status |
---|---|---|---|
1 | 800 | operational since December 2019. [3] | |
2 | 800 | Operational since October 1, 2021. |
{{
cite web}}
: CS1 maint: archived copy as title (
link)
Darlipali Super Thermal Power Station | |
---|---|
| |
Official name | NTPC |
Country | India |
Location | Sundargarh |
Coordinates | 21°52′57″N 83°57′31″E / 21.88250°N 83.95861°E |
Status | Under Construction |
Owner(s) | NTPC |
Operator(s) | |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Make and model | BHEL |
Nameplate capacity | 1600 MW |
Darlipali Super Thermal Power Station at Darlipali village in Sundargarh district in Indian state of Odisha. [1] The power plant is one of the coal based power plants of NTPC Limited. [2] Coal will be obtained from Dulanga and Pakri Barwadih Coal Block and water supply will be sourced from the Hirakund Reservoir on the Mahanadi River through a pipeline at over a distance of about 30.0 km from project site. Plant is under construction by Bharat Heavy Electrical Limited (BHEL), L&T Power.
Its planned capacity of 1600 MW (2x800 MW).
Unit Number | Capacity ( MW) | Date of Commissioning | Status |
---|---|---|---|
1 | 800 | operational since December 2019. [3] | |
2 | 800 | Operational since October 1, 2021. |
{{