PhotosLocation


culture+park+station Latitude and Longitude:

23°06′33″N 113°14′56″E / 23.109186°N 113.248976°E / 23.109186; 113.248976
From Wikipedia, the free encyclopedia
(Redirected from Culture Park Station)
Cultural Park

文化公园
Transfer node to Line 8 from Line 6 Platform 4 (Line 8 towards Wanshengwei)
Chinese name
Simplified Chinese文化公园站
Traditional Chinese文化公園站
Transcriptions
Standard Mandarin
Hanyu PinyinWénhuà Gōngyuán Zhàn
Yue: Cantonese
Jyutpingman4faa3 gung1jyun4 zaam6
General information
Location Liwan District, Guangzhou, Guangdong
China
Coordinates 23°06′33″N 113°14′56″E / 23.109186°N 113.248976°E / 23.109186; 113.248976
Operated byGuangzhou Metro Co. Ltd.
Line(s)
Platforms4 (1 island platform and 1 split island platform)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code6 08 (Line 6)
8 14 (Line 8)
History
Opened28 December 2013 (line 6)
28 December 2019 (Line 8)
Services
Preceding station Guangzhou Metro Following station
Huangsha
towards Xunfenggang
Line 6 Yide Lu
towards Xiangxue
Hualinsi Buddhist Temple
towards Jiaoxin
Line 8 Tongfuxi
towards Wanshengwei

Cultural Park station ( simplified Chinese: 文化公园站; traditional Chinese: 文化公園站; pinyin: Wénhuà Gōngyuán zhàn) is an interchange station between Line 6 and Line 8 of the Guangzhou Metro. It is located underground in the Liwan District and started operation on 28 December 2013. [1]

Station layout

G - Exits A, B, D, E
L1
Concourse
Lobby Customer Service, Shops, Vending machines, ATMs
L2
Equipment Area
- Station equipment
L3
Line 6 Platforms
Reserved Zone Reserved for Line 8
Platform 2 arrow for L   6  towards Xunfenggang ( Huangsha)
Island platform, doors will open on the left
Platform 1   6  towards Xiangxue ( Yide Lu) arrow for R
L4
Line 8 Platforms
Platform 3 arrow for L   8  towards Jiaoxin ( Hualinsi Buddhist Temple)
Side platform, doors will open on the left
Pedestrian Passageway Passage linking Line 8 platforms
Side platform, doors will open on the left
Platform 4   8  towards Wanshengwei ( Tongfuxi) arrow for R

Exits

Exit number Exit location
Exit A Xidi Ermalu
Exit B Xidi Ermalu
Exit D Zhen'an Lu
Exit E Liu'ersan Lu

Gallery

References

  1. ^ Zheng, Xiaojia. "Guangzhou Metro Line 6 Scheduled to Open on Dec. 28". Life of Guangzhou. Guangzhou Interactive Information Network. Archived from the original on 27 January 2021. Retrieved 10 January 2014.

culture+park+station Latitude and Longitude:

23°06′33″N 113°14′56″E / 23.109186°N 113.248976°E / 23.109186; 113.248976
From Wikipedia, the free encyclopedia
(Redirected from Culture Park Station)
Cultural Park

文化公园
Transfer node to Line 8 from Line 6 Platform 4 (Line 8 towards Wanshengwei)
Chinese name
Simplified Chinese文化公园站
Traditional Chinese文化公園站
Transcriptions
Standard Mandarin
Hanyu PinyinWénhuà Gōngyuán Zhàn
Yue: Cantonese
Jyutpingman4faa3 gung1jyun4 zaam6
General information
Location Liwan District, Guangzhou, Guangdong
China
Coordinates 23°06′33″N 113°14′56″E / 23.109186°N 113.248976°E / 23.109186; 113.248976
Operated byGuangzhou Metro Co. Ltd.
Line(s)
Platforms4 (1 island platform and 1 split island platform)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code6 08 (Line 6)
8 14 (Line 8)
History
Opened28 December 2013 (line 6)
28 December 2019 (Line 8)
Services
Preceding station Guangzhou Metro Following station
Huangsha
towards Xunfenggang
Line 6 Yide Lu
towards Xiangxue
Hualinsi Buddhist Temple
towards Jiaoxin
Line 8 Tongfuxi
towards Wanshengwei

Cultural Park station ( simplified Chinese: 文化公园站; traditional Chinese: 文化公園站; pinyin: Wénhuà Gōngyuán zhàn) is an interchange station between Line 6 and Line 8 of the Guangzhou Metro. It is located underground in the Liwan District and started operation on 28 December 2013. [1]

Station layout

G - Exits A, B, D, E
L1
Concourse
Lobby Customer Service, Shops, Vending machines, ATMs
L2
Equipment Area
- Station equipment
L3
Line 6 Platforms
Reserved Zone Reserved for Line 8
Platform 2 arrow for L   6  towards Xunfenggang ( Huangsha)
Island platform, doors will open on the left
Platform 1   6  towards Xiangxue ( Yide Lu) arrow for R
L4
Line 8 Platforms
Platform 3 arrow for L   8  towards Jiaoxin ( Hualinsi Buddhist Temple)
Side platform, doors will open on the left
Pedestrian Passageway Passage linking Line 8 platforms
Side platform, doors will open on the left
Platform 4   8  towards Wanshengwei ( Tongfuxi) arrow for R

Exits

Exit number Exit location
Exit A Xidi Ermalu
Exit B Xidi Ermalu
Exit D Zhen'an Lu
Exit E Liu'ersan Lu

Gallery

References

  1. ^ Zheng, Xiaojia. "Guangzhou Metro Line 6 Scheduled to Open on Dec. 28". Life of Guangzhou. Guangzhou Interactive Information Network. Archived from the original on 27 January 2021. Retrieved 10 January 2014.

Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook