The Bazhong–Dazhou railway ( Chinese: å·´è¾¾é“è·¯) is a railway line in Sichuan, China.
Construction on the line began on 27 September 2009. It opened on 10 January 2016. [1] [2]
At Bazhong railway station the line continues as the Guangyuan–Bazhong railway. The line joins the Xiangyang–Chongqing railway north of Dushi railway station. [3] The line is 128 kilometres (80 mi) long and has a maximum speed of 120 kilometres per hour (75 mph). [1]
The Bazhong–Dazhou railway ( Chinese: å·´è¾¾é“è·¯) is a railway line in Sichuan, China.
Construction on the line began on 27 September 2009. It opened on 10 January 2016. [1] [2]
At Bazhong railway station the line continues as the Guangyuan–Bazhong railway. The line joins the Xiangyang–Chongqing railway north of Dushi railway station. [3] The line is 128 kilometres (80 mi) long and has a maximum speed of 120 kilometres per hour (75 mph). [1]