From Wikipedia, the free encyclopedia

The Bazhong–Dazhou railway ( Chinese: å·´è¾¾é“è·¯) is a railway line in Sichuan, China.

History

Construction on the line began on 27 September 2009. It opened on 10 January 2016. [1] [2]

Specification

At Bazhong railway station the line continues as the Guangyuan–Bazhong railway. The line joins the Xiangyang–Chongqing railway north of Dushi railway station. [3] The line is 128 kilometres (80 mi) long and has a maximum speed of 120 kilometres per hour (75 mph). [1]

References

  1. ^ a b "å·´è¾¾é“路正å¼é€šè½¦ 巴中到é‡åº†ä»…5个多å°æ—¶". Sina (in Chinese). 2016-01-11. Archived from the original on 2016-09-17. Retrieved 2021-12-03.
  2. ^ "å·´è¾¾é“路正å¼é€šè½¦" (in Chinese). CTN. 2016-01-11. Retrieved 2021-12-03.
  3. ^ "å·´è¾¾é“路(达州段)建设工程全速推进". The People's Government of Sichuan Province (in Chinese). 2011-05-09. Archived from the original on 2011-10-28. Retrieved 2021-12-06.
From Wikipedia, the free encyclopedia

The Bazhong–Dazhou railway ( Chinese: å·´è¾¾é“è·¯) is a railway line in Sichuan, China.

History

Construction on the line began on 27 September 2009. It opened on 10 January 2016. [1] [2]

Specification

At Bazhong railway station the line continues as the Guangyuan–Bazhong railway. The line joins the Xiangyang–Chongqing railway north of Dushi railway station. [3] The line is 128 kilometres (80 mi) long and has a maximum speed of 120 kilometres per hour (75 mph). [1]

References

  1. ^ a b "å·´è¾¾é“路正å¼é€šè½¦ 巴中到é‡åº†ä»…5个多å°æ—¶". Sina (in Chinese). 2016-01-11. Archived from the original on 2016-09-17. Retrieved 2021-12-03.
  2. ^ "å·´è¾¾é“路正å¼é€šè½¦" (in Chinese). CTN. 2016-01-11. Retrieved 2021-12-03.
  3. ^ "å·´è¾¾é“路(达州段)建设工程全速推进". The People's Government of Sichuan Province (in Chinese). 2011-05-09. Archived from the original on 2011-10-28. Retrieved 2021-12-06.

Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook