PhotosLocation


aston+church+road+overbridge Latitude and Longitude:

52°29′53″N 1°51′25″W / 52.498°N 1.857°W / 52.498; -1.857
From Wikipedia, the free encyclopedia
Aston Church Road Overbridge
Coordinates 52°29′53″N 1°51′25″W / 52.498°N 1.857°W / 52.498; -1.857
CarriesAston Church Road
Crosses
Locale Birmingham, England
Location

Aston Church Road Overbridge is a planned road bridge in Birmingham, England. [1]

Background

The existing Aston Court Overbridge is not long enough to allow High Speed 2 to pass underneath. As part of the project, it will be demolished and replaced with a new structure. [2]

History

Planning

The initial design for the bridge was revealed to the public in 2021. A revised design was released in November 2022 with a wider walkway and altered lighting. [3] [4] The bridge was given planning permission in September 2023. [2]

Construction

Preparatory works began in 2022. [2]

References

  1. ^ "Aston Church Road Overbridge" (PDF). High Speed 2. Retrieved 2023-09-02.
  2. ^ a b c Haynes, Jane (2023-09-01). "Glimpse of future shows how new HS2 bridge will connect Nechells and Saltley". BirminghamLive. Retrieved 2023-09-01.
  3. ^ Johnson, Thomas (2022-11-16). "HS2 reveals updated Birmingham bridge designs after community feedback". New Civil Engineer. Retrieved 2023-09-01.
  4. ^ Cramp, Thomas (2022-11-15). "Designs for brown HS2 bridge with LED lights unveiled for Birmingham". BirminghamLive. Retrieved 2023-09-01.

aston+church+road+overbridge Latitude and Longitude:

52°29′53″N 1°51′25″W / 52.498°N 1.857°W / 52.498; -1.857
From Wikipedia, the free encyclopedia
Aston Church Road Overbridge
Coordinates 52°29′53″N 1°51′25″W / 52.498°N 1.857°W / 52.498; -1.857
CarriesAston Church Road
Crosses
Locale Birmingham, England
Location

Aston Church Road Overbridge is a planned road bridge in Birmingham, England. [1]

Background

The existing Aston Court Overbridge is not long enough to allow High Speed 2 to pass underneath. As part of the project, it will be demolished and replaced with a new structure. [2]

History

Planning

The initial design for the bridge was revealed to the public in 2021. A revised design was released in November 2022 with a wider walkway and altered lighting. [3] [4] The bridge was given planning permission in September 2023. [2]

Construction

Preparatory works began in 2022. [2]

References

  1. ^ "Aston Church Road Overbridge" (PDF). High Speed 2. Retrieved 2023-09-02.
  2. ^ a b c Haynes, Jane (2023-09-01). "Glimpse of future shows how new HS2 bridge will connect Nechells and Saltley". BirminghamLive. Retrieved 2023-09-01.
  3. ^ Johnson, Thomas (2022-11-16). "HS2 reveals updated Birmingham bridge designs after community feedback". New Civil Engineer. Retrieved 2023-09-01.
  4. ^ Cramp, Thomas (2022-11-15). "Designs for brown HS2 bridge with LED lights unveiled for Birmingham". BirminghamLive. Retrieved 2023-09-01.

Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook