PhotosLocation


vlorë+international+airport Latitude and Longitude:

40°36′25.7″N 19°25′41.6″E / 40.607139°N 19.428222°E / 40.607139; 19.428222 (Vlorë Airport)
From Wikipedia, the free encyclopedia
Vlora International Airport

Aeroporti Ndërkombëtar i Vlorës
Old Akerni Airfield
Summary
Airport typePublic
Serves Vlorë
Location Novoselë
Coordinates 40°36′25.7″N 19°25′41.6″E / 40.607139°N 19.428222°E / 40.607139; 19.428222 (Vlorë Airport)
Website vlora-airport.com
Map
Vlora International Airport is located in Albania
Vlora International Airport
Vlora International Airport
Vlora International Airport is located in Europe
Vlora International Airport
Vlora International Airport

Vlora International Airport (alternatively spelled Vlorë International Airport) is an international airport under construction since 2021 near Akerni in the Vjosa Wild River National Park, 10 km north of the city of Vlorë, Albania. This airport will be the third international airport in Albania after Tirana International Airport and Kukës International Airport. The project also includes the construction of a marina and agri-tourism site as part of the airport.

History

On 17 January 2018, the Turkish-consortium that built the Istanbul Airport, offered to build Vlorë Airport in a regional project that also paves the way for Albania to set up its national flag carrier ( Air Albania) and reduce current ticket prices. The Turkish joint venture consortium of Cengiz-Kolin- Limak-Mapa- Kalyon offered to build the airport as part of the assistance the Albanian government has been receiving from the Turkish government and Turkish Airlines. [1] However, the Turkish consortium decided to withdraw from the initiative a year later. [2]

In September 2019, a new project was announced by the Albanian Government consisting of the construction of a marina and retail complex including an agritourism site. [3][ failed verification]

The tender for the construction of the airport was temporarily suspended by the Albanian government on 31 March 2020 due to the COVID-19 pandemic. [4]

A consortium made up of Behgjet Pacolli's Mabco Constructions, the Turkish YDA Group and the Kosovar 2A Group Shpk was the winner of the international tender and the contract was signed on 20 April 2021. [5] Prior to the commencement of the construction of the airport, environment and archaeological studies were carried out. The construction of the airport will take 36 months and the project includes the construction of a 3.2 km (2.0 mi) runway, hangar for aircraft maintenance and cargo service. The work for the construction of the airport was launched officially on 28 November 2021 with a completion target time of April 2024. [6] [7]

As of November 2023, it is planned to open the airport in March 2025. [8] [9]

Environmental concerns

The building of the Vlora Airport inside the Vjosa-Narta Protected Area is in contradiction to national laws and international biodiversity protection conventions that Albania has ratified. The Vjosa Wild River National Park is a candidate for the Emerald site network, which provides shelter to more than 62 species of birds listed in the EU Birds directive. [10] The Bern Convention called on the Albanian Government to review the plans to build an airport inside the Vjosa-Narta Protected Area. [11] The new airport is planned to accommodate wide-body aircraft and will be the biggest airport in the country. [12] It is expected to have a major impact on economic growth and tourism, but on the other hand, a grave negative impact on the biodiversity of the area as the airport will be located entirely in the Narta Lagoon, which is a protected area in Albania. [13] Environmentalists have expressed their concern about the possible collision of airplanes with birds, as Narta Lagoon is a major breeding and living place of migratory birds.[ citation needed] A spokesman for the Albanian Ornithological Society said that the planned airport was too close to Tirana Airport for the project to make sense. [14]

See also

References

  1. ^ "Turkish consortium bids to build Vlora airport as Albania prepares to launch national carrier:: Tirana Times". Retrieved 14 July 2018.
  2. ^ "After Erdoğan's Defeat, Turkish Consortium Withdraws from Vlora Airport Project". Exit.al. Archived from the original on 2022-03-21. Retrieved 2019-12-20.
  3. ^ "Albania invites bids for Vlora airport construction project". SEE News.
  4. ^ "Albania suspends tender for Vlora airport construction". seenews.com. Retrieved 2020-08-31.
  5. ^ "Albania signs 104 million-euro deal to build new airport". The Washington Post. Retrieved 20 April 2021.
  6. ^ "PM Rama announces start of works for Vlora Airport". Albanian Daily News.
  7. ^ "PM Rama inspects works at construction site of Vlora Airport". Albanian Daily News.
  8. ^ "Albania's Vlora Airport to start operations in March 2025". SeeNews. Retrieved 2024-03-10.
  9. ^ "Vlora Airport's 1st Flight in March 2025". ALBANIA DAILY NEWS. Retrieved 2024-03-10.
  10. ^ "Albania Report 2021". European Commission. Retrieved 4 February 2022.
  11. ^ "Complaint No. 2016/5: Open File: Albania: Presumed negative impact of hydro-power plant development on the Vjosa river" (PDF). Retrieved 4 February 2022.
  12. ^ "Vlora airport, the Albanian government presents the new project". albanianews.it. Archived from the original on 2019-12-20. Retrieved 2019-12-20.
  13. ^ "Vlora Airport Project to Take-off Soon :: Invest in Albania". Retrieved 14 July 2018.
  14. ^ Gale-Coleman, Eibhlis (20 July 2023). "Albania: fears grow over environmental impact of new airport". The Guardian. Retrieved 24 July 2023.

External links


vlorë+international+airport Latitude and Longitude:

40°36′25.7″N 19°25′41.6″E / 40.607139°N 19.428222°E / 40.607139; 19.428222 (Vlorë Airport)
From Wikipedia, the free encyclopedia
Vlora International Airport

Aeroporti Ndërkombëtar i Vlorës
Old Akerni Airfield
Summary
Airport typePublic
Serves Vlorë
Location Novoselë
Coordinates 40°36′25.7″N 19°25′41.6″E / 40.607139°N 19.428222°E / 40.607139; 19.428222 (Vlorë Airport)
Website vlora-airport.com
Map
Vlora International Airport is located in Albania
Vlora International Airport
Vlora International Airport
Vlora International Airport is located in Europe
Vlora International Airport
Vlora International Airport

Vlora International Airport (alternatively spelled Vlorë International Airport) is an international airport under construction since 2021 near Akerni in the Vjosa Wild River National Park, 10 km north of the city of Vlorë, Albania. This airport will be the third international airport in Albania after Tirana International Airport and Kukës International Airport. The project also includes the construction of a marina and agri-tourism site as part of the airport.

History

On 17 January 2018, the Turkish-consortium that built the Istanbul Airport, offered to build Vlorë Airport in a regional project that also paves the way for Albania to set up its national flag carrier ( Air Albania) and reduce current ticket prices. The Turkish joint venture consortium of Cengiz-Kolin- Limak-Mapa- Kalyon offered to build the airport as part of the assistance the Albanian government has been receiving from the Turkish government and Turkish Airlines. [1] However, the Turkish consortium decided to withdraw from the initiative a year later. [2]

In September 2019, a new project was announced by the Albanian Government consisting of the construction of a marina and retail complex including an agritourism site. [3][ failed verification]

The tender for the construction of the airport was temporarily suspended by the Albanian government on 31 March 2020 due to the COVID-19 pandemic. [4]

A consortium made up of Behgjet Pacolli's Mabco Constructions, the Turkish YDA Group and the Kosovar 2A Group Shpk was the winner of the international tender and the contract was signed on 20 April 2021. [5] Prior to the commencement of the construction of the airport, environment and archaeological studies were carried out. The construction of the airport will take 36 months and the project includes the construction of a 3.2 km (2.0 mi) runway, hangar for aircraft maintenance and cargo service. The work for the construction of the airport was launched officially on 28 November 2021 with a completion target time of April 2024. [6] [7]

As of November 2023, it is planned to open the airport in March 2025. [8] [9]

Environmental concerns

The building of the Vlora Airport inside the Vjosa-Narta Protected Area is in contradiction to national laws and international biodiversity protection conventions that Albania has ratified. The Vjosa Wild River National Park is a candidate for the Emerald site network, which provides shelter to more than 62 species of birds listed in the EU Birds directive. [10] The Bern Convention called on the Albanian Government to review the plans to build an airport inside the Vjosa-Narta Protected Area. [11] The new airport is planned to accommodate wide-body aircraft and will be the biggest airport in the country. [12] It is expected to have a major impact on economic growth and tourism, but on the other hand, a grave negative impact on the biodiversity of the area as the airport will be located entirely in the Narta Lagoon, which is a protected area in Albania. [13] Environmentalists have expressed their concern about the possible collision of airplanes with birds, as Narta Lagoon is a major breeding and living place of migratory birds.[ citation needed] A spokesman for the Albanian Ornithological Society said that the planned airport was too close to Tirana Airport for the project to make sense. [14]

See also

References

  1. ^ "Turkish consortium bids to build Vlora airport as Albania prepares to launch national carrier:: Tirana Times". Retrieved 14 July 2018.
  2. ^ "After Erdoğan's Defeat, Turkish Consortium Withdraws from Vlora Airport Project". Exit.al. Archived from the original on 2022-03-21. Retrieved 2019-12-20.
  3. ^ "Albania invites bids for Vlora airport construction project". SEE News.
  4. ^ "Albania suspends tender for Vlora airport construction". seenews.com. Retrieved 2020-08-31.
  5. ^ "Albania signs 104 million-euro deal to build new airport". The Washington Post. Retrieved 20 April 2021.
  6. ^ "PM Rama announces start of works for Vlora Airport". Albanian Daily News.
  7. ^ "PM Rama inspects works at construction site of Vlora Airport". Albanian Daily News.
  8. ^ "Albania's Vlora Airport to start operations in March 2025". SeeNews. Retrieved 2024-03-10.
  9. ^ "Vlora Airport's 1st Flight in March 2025". ALBANIA DAILY NEWS. Retrieved 2024-03-10.
  10. ^ "Albania Report 2021". European Commission. Retrieved 4 February 2022.
  11. ^ "Complaint No. 2016/5: Open File: Albania: Presumed negative impact of hydro-power plant development on the Vjosa river" (PDF). Retrieved 4 February 2022.
  12. ^ "Vlora airport, the Albanian government presents the new project". albanianews.it. Archived from the original on 2019-12-20. Retrieved 2019-12-20.
  13. ^ "Vlora Airport Project to Take-off Soon :: Invest in Albania". Retrieved 14 July 2018.
  14. ^ Gale-Coleman, Eibhlis (20 July 2023). "Albania: fears grow over environmental impact of new airport". The Guardian. Retrieved 24 July 2023.

External links


Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook